My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
2500
>
2900 - Site Mitigation Program
>
PR0524190
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2020 2:10:20 PM
Creation date
4/3/2020 1:50:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0524190
PE
2965
FACILITY_ID
FA0016241
FACILITY_NAME
STOCKTON REGIONAL WATER CONTROL FAC
STREET_NUMBER
2500
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16333003
CURRENT_STATUS
01
SITE_LOCATION
2500 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
729
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
£v rri <br /> CO <br /> sr <br /> August 9 , 1985 �p <br /> California Regional Water Quality <br /> Control Board - Central Valley Region <br /> 3201 S Street <br /> Sacramento CA 95816-/090 <br /> Attention: William H. Crooks , Executive Officer <br /> CITY OF STOCKTON - ADMINISTRATIVE CIVIL LIABILITY COMPLAINT <br /> NO. ACL-003 <br /> Pursuant to discussions with Antonia Vorster and Dan Ward of your <br /> start on July 30 , 1985 , the tollowing information is provided to <br /> advise you of corrective actions taken by the City of Stockton <br /> with regard to the compliance problems occurring in June 1985 as <br /> outlined in Administrative Civil Liability Complaint No. ACL-003: <br /> 1 . Additional sulfonation equipment that will double current <br /> dechlorination capacity has been ordered and is scheduled to be <br /> shipped in September 1985 . The consulting firm of CHEM Hill is <br /> assisting with the detailed design and installation inspection. <br /> The new equipment installation will include a fully automatic <br /> control system to assure that adequate dechlorination occurs . <br /> 2 . The consulting rirm of Brown and Caldwell is currently <br /> studying the disinfection problem in order to determine the cause <br /> and to develop an appropriate action plan to eliminate any such <br /> problems in the tuture. <br /> 3. On June 21-22 , 1985 the City did not discharge. On June 23 <br /> sodium hydroxide was brought to the tertiary plant and temporary <br /> upward pH adjustment capability was established and was placed in <br /> service . <br /> 4 . The City staff is studying permanent upward pH adjustment <br /> process alternatives and plans on recommending permanent <br /> facilities in next year' s Capital Improvement Program budget. <br /> p � <br />
The URL can be used to link to this page
Your browser does not support the video tag.