My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE HISTORY
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6633
>
2900 - Site Mitigation Program
>
PR0528433
>
SITE HISTORY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2020 2:36:45 PM
Creation date
4/3/2020 2:26:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE HISTORY
RECORD_ID
PR0528433
PE
2957
FACILITY_ID
FA0019174
FACILITY_NAME
CHEVRON SERVICE STATION 9-6171
STREET_NUMBER
6633
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09741048
CURRENT_STATUS
02
SITE_LOCATION
6633 PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
option lA Continued. <br /> 10. ,- Design of double-walled tank .and system allows for monitoring of the <br /> annular space. <br /> A. Nonmotor vehicle fuels - No stickn allowed. <br /> B. Motor vehicle fuels `-- Stiff allowed. <br /> 1 . Striker .plates required- See Article 3, Section 2635 <br /> 11 . Double-walled tank and system: <br /> A. Releases from primary containers designed to monitoring specificdevice location <br /> within the annular space. to be detected by <br /> 'fittings;, coatings, or linings not inherent <br /> 12. Any special accessories, within <br /> ry container or double=walled underground <br /> the initial design-of the prima <br /> storage tank: <br /> A. -Shall be approved by a nationally recognized independent testing <br /> organization or <br /> B. A demonstration of integrity with the primary container or double-walled <br /> underground. storage tank shall be required. <br /> 13. Tanks subject to flotation shall be: <br /> A. Weighted <br /> B. Anchored <br /> C. Methods-specified by manufacturer used. . <br /> 14. Detail of tank and piping,system excavation and cover. <br /> 15. Detail of piping cross-sectional and termination. <br /> 16. Detail of tank- cross-sectional.. <br /> 17-. Detail of -spill fill box. <br /> 18. Detail'.of .catchment basins/sumps. <br /> t as installed. <br /> 1.9. Detail of monitoring equipmen <br />
The URL can be used to link to this page
Your browser does not support the video tag.