My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE HISTORY
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6633
>
2900 - Site Mitigation Program
>
PR0528433
>
SITE HISTORY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2020 2:36:45 PM
Creation date
4/3/2020 2:26:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE HISTORY
RECORD_ID
PR0528433
PE
2957
FACILITY_ID
FA0019174
FACILITY_NAME
CHEVRON SERVICE STATION 9-6171
STREET_NUMBER
6633
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09741048
CURRENT_STATUS
02
SITE_LOCATION
6633 PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> OPTION 2A <br /> ARTICLE 3, SECTION 2633/2634 <br /> MOTOR VEHICLE FUELS ONLY <br /> CONSTRUCTION <br /> 1. Requirements: <br /> A. Approved tank construction material <br /> B. Leak interception and detection system which complies with Article 3, <br /> Section 2631(c). <br /> C. Membrane liners must comply with Article. 3, Section 2633(e) , (1) , (2) , <br /> (_3) , (4) ,[5) and are only allowed for piping systems (Department Policy) <br /> D. Demonstrate that the leak interception and detection systems protects <br /> round water .from contamination (Article 3.9 Section 2633(f) , (1 ), (2) , (3) 9 <br /> round(5) , (6) , (7). <br /> E. . Pressurized piping systems must be installed with a leak detector that is <br /> capable of automatically shutting off the product pumps. <br /> 1 . Any single wall component "tank pr piping" requires daily inventory <br /> reconcilliation and annual precision tests as -part of the monitoring <br /> program. <br /> F. Before covering, the tank(s) and system(s) must be tested to NFPA 30, <br /> Standards. <br /> G. Before use -, the tank(s) and system(.$) must be tested in accordance to <br /> NFPA 329. <br /> H. Provide soil profile of vadose zone if membrane liners are used. <br /> OPTION 2B <br /> ARTICLE 3, SECTION 2634 <br /> MOTOR VEHICLE` FUELS ONLY <br /> MONITORING J <br /> 1 . Requirements (.leak interception and detection system(s)). <br /> A. Floor must be constructed .on a firm base -and sloped to a collection sump. <br /> B. Access casings must be installed in accordance to Article 3, Section <br /> 2634 (c) (1 thru 6) , (d) (1 ). <br /> C. Submit written monitoring and response plan as stated in Article 3, ` <br /> Section 2634 (d) (1-3) , 2634(e) (1-5). <br /> D. Hard wiring of electronic monitoring systems is required. <br /> E. Provide manufacturer's written installation instructions. <br /> i <br /> �A� <br />
The URL can be used to link to this page
Your browser does not support the video tag.