My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
1022
>
2900 - Site Mitigation Program
>
PR0534875
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 1:44:13 PM
Creation date
4/7/2020 1:18:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0534875
PE
2960
FACILITY_ID
FA0020170
FACILITY_NAME
AAA TRUCK WASH/JIMCO TRUCK PLAZA
STREET_NUMBER
1022
Direction
E
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102004
CURRENT_STATUS
01
SITE_LOCATION
1022 E FRONTAGE RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC) HH SEVVICES <br /> SAN JOAQUIN COUNTY ?, <br /> ENVIRONMENTAL HEALTH DIVISION <br /> Karen Furst, M.D., M.P.H., Health Officer �iFs �'; <br /> 304 East Weber Avenue,Third Floor • Stockton, CA 95202 <br /> 209/468-3420 <br /> RUSTY FIRENZE <br /> OLYMPIAN OIL CO <br /> 260 MICHELLE COURT <br /> SOUTH SAN FRANCISCO CA 94080-6297 <br /> RE: JIMCO TRUCK PLAZA <br /> 22502 S.Hwy 99 <br /> Ripon,CA <br /> WORKPLAN: Aquifer Pumping Test Work Plan Addendum DATED: 11/29/01 <br /> PREPARED BY: Adrnnxd GeoEnvironmental,Inc. <br /> APPROVED X <br /> DISAPPROVED ❑ <br /> ADDENDUM ❑ Submit by: — <br /> ADEQUATE AND NECESSARY ELEMEN'T'S OF THE WORKPLAN(H&S 25299.37,subd.(c)(3).): <br /> 1. Conduct a 24-hr aquifer pump test instead of the previously approved 12-hr test. <br /> 2.. Laboratory analysis of soil and groundwater samples for total petroleum hydrocarbons,BTEX,and fuel <br /> oxygenating compounds. <br /> COMMENTS AND CONDITIONS: <br /> 1. Obtain a well permit from PHS/EHD and notify PHS/EHD at least 48 hours prior to scheduled work <br /> dates. <br /> DATED <br /> Sam Savig EHS <br /> LOP/Site Mitigation Unit IV <br /> Cc: CVRWQCB-Marty Hartzell <br /> Advanced GeoEnvironmental,Inc.-William Little <br /> A Division of San Joaquin County Health Care Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.