My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
1022
>
2900 - Site Mitigation Program
>
PR0534875
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 1:44:13 PM
Creation date
4/7/2020 1:18:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0534875
PE
2960
FACILITY_ID
FA0020170
FACILITY_NAME
AAA TRUCK WASH/JIMCO TRUCK PLAZA
STREET_NUMBER
1022
Direction
E
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102004
CURRENT_STATUS
01
SITE_LOCATION
1022 E FRONTAGE RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLI HEALTH SERVICES <br /> SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DIVISION <br /> Karen Furst, M.D., M.PH., Health Officer <br /> 304 East Weber Avenue,Third Floor • Stockton, CA 95202 <br /> 209/468-3420 <br /> RUSTY FIRENZE <br /> OLYMPIAN OIL CO <br /> 260 MICHELLE COURT <br /> SOUTH SAN FRANCISCO CA 94080-6297 <br /> RE: JIMCO TRUCK PLAZA <br /> 22502 S.Hwy 99 <br /> Ripon,CA <br /> WORKPLAN: Site Assessment and Feasibility Work Plan DATED: 06/18/01 <br /> PREPARED BY: Aduanxd GeoEnvironmental Inc. <br /> APPROVED X . <br /> DISAPPROVED F1 <br /> ADDENDUM ❑ Submit by: <br /> ADEQUATE AND NECESSARY ELEMENTS OF THE WORKPLAN(H&S 25299.37,subd.(c)(3).): <br /> 1. Advancement of two soil borings to at least 45 feet below surface grade(bsg)to collect soil and grab <br /> groundwater samples at proposed intervals for laboratory analysis. <br /> 2. Installation of two groundwater monitoring wells one of which will be used during the groundwater aquifer <br /> pump test as an extraction well(EW-1) and the other for lateral definition of impacted soil and <br /> groundwater(MW-9). <br /> 3. A groundwater extraction pilot test will be conducted to determine the feasibility of groundwater <br /> extraction as an effective remedial alternative. <br /> 4. Laboratory analysis of soil and groundwater samples for total petroleum hydrocarbons,BTEX,and fuel <br /> oxygenating compounds. <br /> COMMENTS AND CONDITIONS: <br /> 1. Per a telephone conversation with William Little AGE on July 2,2001,the groundwater extraction <br /> feasibility pilot test will be done for a twelve hour period at a constant pumping rate of five gallons per <br /> minute. <br /> 2. Obtain a well permit from PHS/EHD and notifyPHS/EHD at least 48 hours prior to the proposed <br /> scheduled work dates. <br /> DATED <br /> D/ BY , <br /> Sam Savig EHS <br /> LOP/Site Mitigation Unit IV <br /> Cc: CVRWQCB-Marty Hartzell <br /> William Little-AGE <br /> z D <br /> A Division of San Joaquin County Health Care Services <br /> ii <br />
The URL can be used to link to this page
Your browser does not support the video tag.