Laserfiche WebLink
C A M B A <br /> • FEASIBILITY TEST REPORT <br /> JIMCO Truck Plaza <br /> 1022 Frontage Road <br /> Ripon, California <br /> Cambria Project No 165-1556 <br /> November 16, 2005 <br /> 10 INTRODUCTION 1 <br /> 20 SITE BACKGROUND . 1 <br /> 21 SITE DESCRIPTION 1 <br /> 22 HISTORICAL SITE OPERATIONS 1 <br /> 23 LOCAL GEOLOGY 2 <br /> 24 LOCAL HYDROGEOLOGY 2 <br /> 25 SENSITIVE RECEPTOR SURVEY 2 <br /> 26 SUMMARY OF PREVIOUS WORK 3 <br /> 30 FEASIBILITY TEST ACTVITIES 5 <br /> 3 1 RATIONALE AND OBJECTIVES 5 <br /> 32 FIELD ACTIVITIES 6 <br /> 3 2 1 SVE Test Procedures 6 <br /> 3 2 2 Combined SVE/AS Test Procedures 7 <br /> 323 Test Equipment 7 <br /> • <br /> 33 TEST RESULTS 8 <br /> 3 3 1 Radius of Vacuum Influence 8 <br /> 332 Vapor Analytical Data 9 <br /> 333 Estimated Hydrocarbon Removal Rate 9 <br /> 40 FEASIBILITY TEST EVALUATION 9 <br /> 50 CLOSING 10 <br /> FIGURES <br /> Figure 1 Vicinity Map <br /> Figure 2 Site Plan <br /> Figure 3 Radius of Vacuum Influence Map <br /> TABLES <br /> Table 1 Well Construction Table <br /> Table 2 Soil Analytical Data <br /> Table 3 Groundwater Elevations and Analytical Data <br /> Table 4 Summary of Feasibility Test Data and Hydrocarbon Mass Removed <br /> Table 5 Feasibility Test Analytical Data <br /> APPENDICES <br /> Appendix A Agency Correspondence <br /> Appendix B Feasibility Test Field Data <br /> Appendix C Laboratory Analytical Reports <br />