Laserfiche WebLink
SENT BY:9163622318-Sacra. , CA ; 8-I6-98 ; 3:43PM ;RADIAN INTERNATIONAL 5 <br /> • MC-Sharpe GMS Boundary CondAerification Work Plait <br /> properly. When working around the CPT (Radian International, 1997).Electric shock can <br /> machinery,employees must make their presence occur where there is direct contact with live <br /> known to the equipment operators. wires or electrical equipment and instruments <br /> that are wet or have faulty wiring.Any extension <br /> A.3.3.6 Noise.CPT work or vehicle traffic can cords used with the equipment should be <br /> result in excessive noise.Ear plugs will provide checked prior to use for cuts or loose <br /> adequate protection from this type of noise. connections in the coating protecting the wires. <br /> Field work is not expected to produce noise <br /> levels in excess of the OSHA permissible A.3.3.10 Heat Stress.Working in elevated <br /> exposure limit of 90 dBA or the action limit of temperatures while wearing PPE may lead to <br /> 85 dBA.It is not anticipated that hearing heat stress in the form of heat exhaustion and/or <br /> protection will be needed;however,car plugs heat stroke. Symptoms of heat exhaustion <br /> will be available to employees As a rule of include dizziness,light-headedness,nausea, <br /> thumb,if staff cannot communicate easily within slurred speech,fatigue,copious perspiration, <br /> 3 feet of each other,hearing protection should be cool clammy skin,and an increased resting heart <br /> used. rate(110 beats/minute).Symptoms of heat <br /> stroke include delirium,fainting,and hot,dry, <br /> A.3.3.7 Underground Utilities.Test locations flushed skin.Heat stroke is a life-threatening <br /> will be surveyed and cleared for underground condition,and immediate medical attention is <br /> utilities,pipes,etc-,by Underground Service required if any symptoms of heat stroke are <br /> Alert(USA). CPT probes will be driven only at observed. <br /> cleared locations. Cleared locations will be <br /> clearly marked.If evidence of utilities is A.3.3.11 Heat stress monitoring and prevention <br /> encountered during CPT installation,work will procedures will be initiated when ambient <br /> stop immediately until the nature of the utility or temperatures exceed 90°F.Heat stress reduction <br /> pipe can be verified. All contacts(regarding the procedures shall consist of the following- <br /> location of buried lines)with utility company <br /> personnel shall be documented. As required by • Potable water and/or GatoradeT will be <br /> the City of Lathrop and San Joaquin County, made available to the field team throughout <br /> encroachment permits are to be secured before the work day.Field personnel will be <br /> conducting any CPT field work. The encouraged to drink fluids frequently.Field <br /> encroachment permits shall be sighed by an teams continuously working outdoors should <br /> authorized DDJC representative and approved break for water at least every hour. <br /> by the issuing agency. <br /> • When temperatures exceed 90°F,all field <br /> A.3.3.8 Mechanical Hazards.Hazards while personnel working outdoors will measure <br /> working with mechanical equipment can include their heart rate at least hourly.If the heart <br /> cuts,contusions,being struck by or striking rate exceeds 110 beats/minute,the <br /> objects,being caught between objects,becoming individual will rest for 10 minutes and drink <br /> entwined in rotating tools,and falling objects, fluids throughout the rest period.The heart <br /> Care should be taken to eliminate these potential rate should again be measured at the end of <br /> hazards by ensuring that mechanical safeguards the rest period. If the heart rate has dropped <br /> are in place,that safe distances between below 110 beaWminute,the individual may <br /> personnel and moving parts are maintained,and return to work. if the heart rate exceeds <br /> that personnel avoid areas where vehicles and 110 beats/minute,contact the on-site <br /> equipment are being moved or positioned. engineer responsible for health and safety. <br /> A.3.3.9 Electrical Hazards.Proper lock- Any personnel displaying signs or <br /> out/tag-out procedures shall be used whenever symptoms of heat stress will stop work and <br /> work is performed on the test systems per rest for at least 15 minutes.If symptoms <br /> Radian's Hazardous Energy Control Program persist beyond this rest period,the on-site <br /> MP-A.dm 4 13 August 1998 <br />