Laserfiche WebLink
SENT BY 9163622318-Sacra. , CA : 8-16-98 : 3 42PM :RADlXN INTERNATIONAL 4 <br /> • DD1C-Sharpe GMS Boundary Cond0verification Work Plan <br /> A.3 Field Activities and Hazard subcontractor personnel or other employees <br /> Analyses working at the site are observed. <br /> A.3.1 General A.3,2.3 This field activity is expected to <br /> present minimal hazards to Radian personnel. <br /> A.3.1.1 This section describes the field The primary hazards are anticipated to be <br /> activities,identifies the potential physical and associated with:working with large equipment <br /> chemical hazards associated with the work,and and working near traffic within roadway right- <br /> presents a miegies/procedures to be used to of-ways. /� <br /> control the identified hazards during the DDJC- *(K.A 3c-lfesv4ml <br /> Sharpe GMS boundary condition verification A.3.3 Physical Hazards <br /> project.Due to the nature of the work associated <br /> with this project,it is not possible to identify all A-3.3.1 The primary physical hazards that are <br /> potential hazards that may be encountered expected during the field work are identified <br /> during this project.It is important that all below.General safe work practices used to <br /> workers at the site remain cognizant of potential minimize the identified hazards are also <br /> hazards that may arise during their work. Once a presented. <br /> hazard is recognized,the appropriate field <br /> supervisor should be notified of the bazard and A.3.3.2 CPT Equipment The CPT vehicle is <br /> procedures should be established to ensure the a medium size transport van. Hazards are <br /> safety of the on-site personnel. presented to workers primarily during <br /> mobilization to the selected test locations. <br /> A.3.2 Field Activities Hazards Drivers will be careful to use appropriate signals <br /> (blinkers,emergency hazard lights,etc.)when <br /> A.3.2.1 The site activities to be conducted pulling off roadways. Drivers will be careful to <br /> during the field activities are briefly described park vehicles at least 5 feet from the roadway <br /> below.Detailed descriptions of the site activities edges where ever feasible. Spotters will be used <br /> are provided in Sectinns 2.0 and 3A of this to assist drivers with final placement of the <br /> Work Plan. vehicle. <br /> The collection of groundwater elevations and A.3.3.3 Roadway 13azxrds- All CPT locations <br /> surface elevations include: adjacent to public roads shall be marked with <br /> traffic cones and construction signage <br /> - Utility clearance; conforming to the current State of California <br /> Department of Transportation guidelines. Signs <br /> - Cone penetrometer testing(CPT),and will be placed approximately 100 feet"up-road" <br /> facing oncoming traffic from the actual CPT <br /> - Surveying. location. In addition,high visibility traffic cones <br /> will be used along the roadway adjacent to the <br /> A.3.2.2 Field activities will be performed by test location extending past the vehicle 25 feet <br /> subcontractors to Radian with technical "up-road"and 5 feet"down-road" <br /> guidance provided by the Radian SG. As with <br /> any data collection activity,several potential A.3.3.4 Field personnel will wear high visibility <br /> health and safety hazards will be present at the vests and will be especially careful not to step <br /> site,including: heavy equipment,electrical,and outside the boundary of traffic cones unless <br /> traffic hazards. The Radian on-site geologist will intentional and they have confirmed that there is <br /> audit the health and safety performance of the no on-coming traffic. <br /> Radian employees and subcontractors,and will <br /> notify the project health and safety officer if A.3.3.5'ro help ensure that employees are <br /> unsafe activities/operations that may endanger aware of equipment in the work area,all <br /> equipment shall have backup alarms that operate <br /> APP-A Jua 3 0 Auprst 1998 <br />