My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2900 - Site Mitigation Program
>
PR0506824
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 3:26:58 PM
Creation date
4/7/2020 2:23:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0506824
PE
2960
FACILITY_ID
FA0007648
FACILITY_NAME
DDRW - SHARPES
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
01
SITE_LOCATION
850 E ROTH RD BLDG S-108
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
705
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DDJC-Sharpe Work Plan-Demolition of B g 137,Closure of Well 2 <br /> 2.4 Asbestos shingles will be removed and • ACM containerization for shipment to a <br /> disposed of prior to demolition of the building's certified landfill will include placing the <br /> wood-frame structure. All Asbestos Containing material in clear plastic bags and placed in <br /> Materials (ACM) will be removed and handled an enclosed container. <br /> according to the following regulations that <br /> pertain to ACM in addition to all other • ACM disposal will occur once the <br /> applicable Local, State, and Federal regulations; appropriate preliminary analysis, waste <br /> profile,and manifesting has been completed <br /> • Title 8, California Code or Regulations, and approved by the disposal facility. The <br /> Article 2.6, Section 3415.15. Certified waste manifest will be signed by Ron Allen <br /> Asbestos Consultant/Site Surveillance of DDJC Sharpe. The material may then be <br /> Technician, California OSHA. scheduled for transport and disposal as Non- <br /> Friable asbestos hazardous waste at one of <br /> • Title 8, California Code or Regulations the following approved asbestos disposal <br /> Section 1529—Occupational Exposure to facilities: <br /> Asbestos. <br /> Azuza Land Reclamation <br /> • Title 40 Code of Federal Regulations Part 61 1201 West Gladstone <br /> Subparts A and M(Revised Subpart B)— Azuza, CA 91702 <br /> National Emission Standard for Asbestos <br /> or: <br /> • Title 40 Code of Federal Regulations Part <br /> 763 "Asbestos-Containing Materials in LaPaz <br /> Schools"; Final Rule and Notice (for 26999 Highway 95 <br /> institutions under the guidelines of the Parker,AZ 95344 <br /> Asbestos Hazard Emergency Response Act" <br /> (A��))„ Final destination of the asbestos will depend <br /> on the total estimated volume,following <br /> 2.5 The removal and disposal of ACM will removal. <br /> include the following controls and procedures; <br /> • Site cleanup will occur after all ACM has <br /> • Dust Control will be achieved using been removed as appropriate. <br /> containment and water misters. <br /> 2.6 Using an excavator fitted with a"thumb" <br /> • Containment chamber will be constructed attachment,the field crew will remove the <br /> as an engineering control to contain friable roofline of the building to create room for <br /> dust generated during ACM removal removal of the well head.The field crew will <br /> activities. The containment will be create separate stockpiles for debris, classified <br /> constructed with PVC framing and 6-mill by material type. As roofing materials are <br /> plastic. The containment structure will removed,the Radian field crew will load <br /> include a two stage decontamination station construction debris into the transport vehicle <br /> at the entry point. provided by DenBeste Transportation Inc. <br /> • Water misters will be used to keep the 2.7 Using a boom truck, the field crew will <br /> ACM wet during removal to control hoist the existing well head and seal the well <br /> airborne dust. opening with a blind flange to avoid entry of any <br /> foreign materials into the well.After removal of <br /> • ACM removal will include the use of water the well head, the Radian field crew will begin a <br /> misters or hose sprayer to control dust. The systematic dismantlement of the existing wood- <br /> material will remain wet throughout the frame structure.This will include all constructed <br /> removal processattachments, and will be completed by <br /> WELL2-WP.do 2 7 September 1999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.