My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2900 - Site Mitigation Program
>
PR0506824
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 3:26:58 PM
Creation date
4/7/2020 2:23:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0506824
PE
2960
FACILITY_ID
FA0007648
FACILITY_NAME
DDRW - SHARPES
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
01
SITE_LOCATION
850 E ROTH RD BLDG S-108
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
705
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. DDJC-Sharpe Work PlanDemolition of Bing 137 Closure of Well 2 <br /> demolition of the concrete foundation that is part • During grout placement, necessary <br /> of Building 137,including the removal and injection pressure will be calculated to <br /> disposal of the concrete material, achieve an effective seal, using specific <br /> gravity of the grout mixture and <br /> 2.8 Using a slurry mix, Radian and Gregg <br /> hydrostatic head of the grout column. <br /> Drilling field crews will pressure grout Well 2 The amount of pressure applied depends <br /> through screened intervals; any excess water that on the characteristics of the cement <br /> is produced during grouting will be slurry, slot size of the well screen, <br /> containerized. It is assumed that the displaced characteristics of the filter pack and <br /> water in the well will be used in conjunction formation,temperature, and well depth <br /> with the slurry mix design. Any well water (maximum pressure is approximately <br /> displaced by grouting that has a pH 1 pound per square inch per foot below <br /> measurement of 7.8 or greater will be contained grade). <br /> in drums. All drummed water will be disposed at <br /> the on-depot groundwater treatment plant. • After the well casing has been backfilled <br /> with grout, the protective casing will be <br /> 2.9 Grouting procedures will include the removed and the well casing cut off at <br /> following: least 2 feet below grade and removed. <br /> • Well-abandonment procedures will Additional grout will continue to be <br /> added to the casing if any settlement <br /> adhere to requirements set forth in occurs. <br /> Bulletin 74-90, California Well <br /> Standards(Department of water . Representatives of the SJCEHD will be <br /> Resources). <br /> notified at least 48 hours in advance of <br /> • The slurry mix(i.e.,grout) will consist the start of well abandonment to allowtime for a field inspection. <br /> of a mixture of Type II Portland cement, <br /> or equiv®lent(e.g., Micro Matrix a Following well abandonment, a Well <br /> Cement or Pozmix ), with 3 pounds of Completion Report(Form DWR 188) <br /> powdered nonbeneficiated bentonite and describing the well destruction will be <br /> 7 gallons of water per 94-pound sack of submitted to the State of California <br /> cement; grout materials will be weighed Department of Water Resources. The <br /> with a mud scale and metered for the report will be signed by a representative <br /> appropriate water-to-cement ratio(slurry of the drilling contractor performing the <br /> weight of approximately 16 pounds per abandonment. <br /> gallon). An accelerant will be used if <br /> needed, based on site conditions. 2.10 A video log of construction activities, <br /> including well closure, will be available upon <br /> • The consistency of the grout will be project completion. Radian will also provide a <br /> sufficient to flow through the well supplementary written log corresponding with <br /> screen and into the filter pack, the video log. In addition, photographs of the <br /> field activities will be taken. Daily Field Reports <br /> • The volume of required plugging will also be completed for distribution to <br /> material will be calculated prior to grout CEHNC and DDJC during the field activities. <br /> mixing, taking into consideration casing <br /> diameter, well depth, and applicable loss 2.11 All work activities performed as part of <br /> of material to the formation. Well the well-abandonment and pumphouse <br /> construction details are included in demolition effort will be documented in the <br /> attachment 2. Verification will ensure comprehensive TO 27 Engineering Technical <br /> that the volume of sealant equals or Memorandum <br /> exceeds the volume of the casing. <br /> WELL2-WP.do 3 7 September 1999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.