Laserfiche WebLink
• COMMENT NO. 5 <br /> V.C.Ie Frequency of Waste Analysis <br /> Provide sampling on an annual basis for all of the <br /> waste streams. <br /> RESPONSE NO. 5 <br /> Replacement page V-15 includes a minimum requirement of annual waste stream <br /> analysis. Replacement page V-15 is included in Enclosure 2. <br /> COMMENT NO. 6 <br /> VI .A.2a Containment System Design <br /> 264.175(b) (4) Figure VI-2 does not show the berms in Building 530. <br /> Provide a drawing that has the berms. <br /> RESPONSE NO. 6 <br /> Replacement Figure VI-2 is included in Enclosure 2. Berms have been added to <br /> Figure VI-2. <br /> COMMENT NO. 7 <br /> VI.A.2c Containment System Capacity <br /> 264.175(b) (3) Provide the length of each of the container storage <br /> • areas for Building 605. <br /> RESPONSE NO. 7 <br /> Replacement Figure VI-4 is included in Enclosure 2. Lengths of the contai er <br /> storage areas are provided on Figure VI-4. <br /> COMMENT N0. 8 <br /> VI.A.5 Engineer' s Certification <br /> 270.14(a) Include an engineer' s certification for Building 605, <br /> also include the registered engineer' s discipline <br /> in the certification. <br /> RESPONSE NO. 8 <br /> Replacement page VI-8 is included in Enclosure 2. Engineer' s certificatio <br /> for buildings 605 and 530 is provided on page VI-8. <br /> • <br />