Laserfiche WebLink
• COMMENT NO. 9 <br /> VII .E.2 Artificial Lighting <br /> Provide a diagram with the locations of artificial <br /> lighting in Buildings 530 and 605. <br /> RESPONSE NO. 9 . <br /> New Figure VII-1 , Light Plan View, is included in Enclosure 2. <br /> COMMENT NO. 10 <br /> VII .G.2 Backflow Prevention Devices <br /> Provide the location of the backflow protection devic <br /> that services Building 605. <br /> RESPONSE NO. 10 <br /> New Figure VII-2, Water Service/Backflow Prevention Plan View, is included in <br /> Enclosure 2. <br /> COMMENT NO. 11 <br /> VIII .A.2a Operational Procedures for Sampling and <br /> Testing Hazardous Waste <br /> • The operational procedures must describe how a generator <br /> gets his waste sampled and tested and the necessary <br /> steps to have the waste stored in Building 605. <br /> RESPONSE NO. 11 <br /> Replacement section VIII .A.2a, page VIII-10, is included in Enclosure 2 in <br /> response to Comment 11. <br /> COMMENT NO. 12 <br /> VIII .B.1a Wastes Placed Inside Designated Areas <br /> Discuss the procedures for unloading wastes to ensure <br /> placement within the proper area (i.e. , the procedure <br /> that the forklift operator follows to accept and place <br /> wastes in Building 605) . <br /> RESPONSE NO. 12 <br /> Replacement section VIII.B.la, pages VIII-11 and VIII-12, are included in <br /> Enclosure 2 in response to Comment 12. <br /> • <br />