Laserfiche WebLink
Sharpe Army Depot <br /> Page 6 <br /> August 21, 1989 <br /> 12) Feasibility Study - The Army should consider conducting <br /> geochemical analysis to determine the plume transport <br /> characteristics. This will assist in the proper design of a <br /> remedial action alternative. Such geochemistry studies should <br /> evaluate the primary and secondary contaminants. <br /> Tracie L. Billington <br /> Waste management Engineer <br /> TBSHADWP. 089 <br />