Laserfiche WebLink
Antonia Vorster -9- 25 August 1989 <br /> h. Vertical placement of the purge pump in deeper monitoring wells is of <br /> primary importance, especially when followed by bailing for samples. <br /> Vertical ump location should be added to the Well Sampling Date Form <br /> (page 5-9�. <br /> In conclusion, most of the above comments pertain to issues that have been <br /> brought to USATHMA and Hunter/ESE' s attention before. Many of the issues are <br /> very basic in nature and are, thus, central to completing an adequate RI. Note <br /> that most of the issues discussed above are not technical disagreemen s on <br /> procedures (though those do exist) , but are failures to accomplish basic needs <br /> and objectives of a Remedial Investigation. This lack of response on USAT MA's, <br /> and more so on Hunter/ESE's, part leads to a significant waste of time and money. <br /> Furthermore, Hunter/ESE's failure to grasp some basic concepts inherent in every <br /> investigation makes me question the project staff' s abilities. <br /> GAR:ej <br />