My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_1992
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2900 - Site Mitigation Program
>
PR0506824
>
SITE INFORMATION AND CORRESPONDENCE_1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 2:59:29 PM
Creation date
4/7/2020 2:38:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1992
RECORD_ID
PR0506824
PE
2960
FACILITY_ID
FA0007648
FACILITY_NAME
DDRW - SHARPES
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
01
SITE_LOCATION
850 E ROTH RD BLDG S-108
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
600
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(9) 2 September 1992 - Response to Agency Comments (CRWQCB, CDTSC) on <br /> FFA Annual Report. <br /> (10) 15 September 1992 - Groundwater Treatment System Discharge <br /> NPDES Permit CA 0081931 Monthly Report. <br /> (11) 18 September 1992 - Comments on Groundwater ROD Aquifier and <br /> Effluent Standards. <br /> (12) 8 October 1992 - Remedial Well-Field Design Using Three- <br /> Dimensional Groundwater Flow and Transport Modeling, September 1992. <br /> b. Meetings with Regulatory Agencies: <br /> (1) 20 August 1992 - Project Managers Meeting at California <br /> Department of Toxic Substances Control Office. <br /> (2) 29-30 September 1992 - Project Managers Meeting at DDRW Sharpe <br /> Facility, Building 330. <br /> c. Other RI/FS Activities: <br /> (1) August-September 1992 - Performed long-term injection test to <br /> determine operation and maintenance requirement of system and effect on <br /> groundwater level. <br /> (2) Sampling and analysis contract with QAL was modified to add <br /> testing for additional metals and PCB in the influent and effluent of both <br /> groundwater treatment systems and selected monitoring wells. Wells which <br /> consistently have BTXE contaminants (EPA Method 602) will be tested <br /> quarterly. <br /> 5. REMEDIAL, REMOVAL, AND INVESTIGATION ACTIVITIES: Remedial and/or removal <br /> activities. <br /> a. The North and South Balloon Groundwater Treatment Systems continued <br /> to operate during this report period. More details on the operation of the <br /> system are included in the monthly NPDES Report. <br /> b. The performance of the groundwater treatment system is evaluated and <br /> discussed in Section 2C, Water Elevation/Contaminant Contour Maps and <br /> Analysis. <br /> 6. REMEDIAL REMOVAL, AND INVESTIGATION ACTIVITIES: Other Activities <br /> a. 19 August 1992 - DDRW, Huntsville Division Corps of Engineers <br /> (CEHND) , and Sacramento District Corps of Engineers (CESAC) met in Sacramento <br /> to discuss the tasking of Sacramento District to remediate the sites where <br /> fuel tanks were removed and contamination remains. <br />
The URL can be used to link to this page
Your browser does not support the video tag.