Laserfiche WebLink
i • <br /> b. 1 October 1992 - DORW, CEHND, and CESAC met at Sharpe to discuss <br /> preliminary scope of work and to visit the sites which require remediation. <br /> c. The draft statement of work for design of Groundwater Remedial System <br /> was sent to the regulatory agencies 4 June 1992 for review. CEHND <br /> coordinated review and the statement of work was finalized to the extent <br /> feasible. Contract was awarded September 1992. Contract will be modified as <br /> necessary so as to achieve the desired final product. <br /> B. PLANNED ACTIVITIES FOR THE FOLLOWING QUARTER: <br /> 1. Submissions to Regulatory Agencies: <br /> (a) Sharpe's Groundwater Treatment System Monthly NPDES Reports <br /> submission (15th day of the month) ; <br /> (b) Quarterly Progress Report - 30 October 1992; <br /> (c) Remedial Well-Field Design Report - 8 October 1992; <br /> (d) Final ROD unsigned (Date to be Determined) . <br /> 2. Work indicated on RI/FS Work Plan Addendum dated July 1992 with <br /> changes agreed to at 29-30 September 1992 Project Managers Meeting will be <br /> implemented starting 9 November 1992. <br /> 3. Project Manager' s Meeting 18 November 1992 , at California Regional <br /> Water Quality Control Board Facility, Conference Room 1A, 3443 Routier Road, <br /> Sacramento, California. <br /> 4. Long-term Injection Test will be completed. <br /> 5. Long-term Pilot Insitu Volatilization Vapor Extraction System Study <br /> will commence. <br /> 6. Continue to operate the North and South Balloon Groundwater Treatment <br /> Systems. <br />