Laserfiche WebLink
2. Additional soils work was also necessitated. <br /> 3. After discussion of different options, all parties agreed to: <br /> a. keeping Groundwater ROD on same schedule; <br /> b. change the "Soils FS" to a Comprehensive FS to include <br /> consideration of groundwater issues not considered in Groundwater FS and ROD; <br /> c. extend the Comprehensive ROD schedule to allow for additional <br /> investigatory work necessary; <br /> d. Schedule tentatively agreed to by all parties; and <br /> e. Comprehensive ROD alternative was deemed the most economical and <br /> timely. <br /> Regulatory Comments on Draft FS April 20, 1992 <br /> Response to Comments and Draft Workplan July 20, 1992 <br /> Comments from Regulators on Draft Workplan September 20, 1992 <br /> Workplan Final October 20, 1992 <br /> Begin Fieldwork November 1, 1992 <br /> Fieldwork Complete December 1, 1992 <br /> Data Analysis March 1 , 1993 <br /> Draft Final Feasibility Study May 1, 1993 <br /> Regulatory Review (New Data from Workplan Effort) July 1, 1993 <br /> Final Feasibility Study August 1 , 1993 <br /> Draft Proposed Plan August 1 , 1993 <br /> Final Proposed Plan September 1 , 1993 <br /> Public Comments and Responsiveness Summary November 1, 1993 <br /> Draft ROD December 1, 1993 <br /> Regulatory Comments February 1 , 1994 <br /> Draft Final ROD (unsigned) April 1 , 1994 <br /> Final ROD (signed) July 1 , 1994 <br /> E. STATUS OF OBTAINING RIGHT-OF-ENTRY NECESSARY FOR MONITORING AND <br /> INSTALLATION OF WELLS. <br /> 1. Moorman' s Manufacturing Company: MW #522, EW #NA-7 and #NA-8 <br /> Right-of-entry agreement in place. <br /> 2. Southern Pacific (SP) Transport Company: MW #521 , 517, 514, 507, <br /> 508, EW TN—A--—6 <br /> Right-of-entry (Easement) will be necessary for the construction and <br /> maintenance of proposed central area system extraction wells and pipeline on <br /> Southern Pacific property. Construction permit will also be necessary to <br /> install conduit for all system lines under railroad tracks. <br /> One agricultural well on SP property (AGW10) . <br />