My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_1992
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2900 - Site Mitigation Program
>
PR0506824
>
SITE INFORMATION AND CORRESPONDENCE_1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 2:59:29 PM
Creation date
4/7/2020 2:38:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1992
RECORD_ID
PR0506824
PE
2960
FACILITY_ID
FA0007648
FACILITY_NAME
DDRW - SHARPES
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
01
SITE_LOCATION
850 E ROTH RD BLDG S-108
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
600
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.0 OBJECTIVES <br /> The Architectural and Engineering firm (AE) implementing this Statement of <br /> Work (SOW) will prepare the remedial design documents for construction of the <br /> final groundwater treatment and disposal system described in the Record of <br /> Decision (ROD) for groundwater dated 16 March 1992 (Reference 10.15) . A dif- <br /> ferent contractor will construct this facility and provide the services neces- <br /> sary for its operation and evaluation. The objectives of this SOW are: <br /> a. Establish the size, scope and nature of the remedial action <br /> described in the ROD; <br /> b. Evaluate and test the extraction and injection network; <br /> C. Develop all plans, specifications, cost estimate, work statements, <br /> and other remedial design documents, specified in this SOW. <br /> The Government anticipates that the design work will progress with the water <br /> treatment plant immediately. Work on the extraction and injection networks <br /> shall proceed upon the AE receiving the extraction/injection engineering <br /> report from the Government. All work is to be in compliance with the Com- <br /> prehensive Environmental Response, compensation, and Liability Act, the Super- <br /> fund Amendments and Reauthorization Act, the National Contingency Plan, EPA <br /> and State of California guidance, the ROD, the Federal Facility Agreement, and <br /> this SOW. This SOW presents general guidelines and performance requirements. <br /> The AE is responsible for developing the detailed designs. The AE shall per- <br /> form all engineering and other calculations necessary to assure proper sizing <br /> and placement of all equipment and wells. Items stipulated in this document <br /> are minimum requirements. The AE shall determine where it is necessary to <br /> provide more than the minimum requirements to meet the goals and performance <br /> requirements of the ROD and this SOW. A Professional Engineer registered in <br /> the State of California shall supervise and certify all work performed under <br /> this contract. <br /> 3.0 REMEDIAL DESIGN <br /> 3. 1. (Task 1) Remedial Design Work Plan <br /> 3.1. 1 Pre-Design Technical Summary. The AE shall prepare a "Pre-Design <br /> Technical Summary" which addresses the following technical items, as described <br /> in Paragraph 4.1.2 of Reference 10. 14, and as follows: <br /> a. summary of available data; <br /> AA-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.