Laserfiche WebLink
Pwir wvw <br /> the contract. The AE shall submit versions of this document in accordance <br /> with the requirements of Section 4.0 and the schedule provided in Section 5.0 <br /> of this SOW. <br /> 3.9 (Task 13)-construction & Operation Cost Estimates The AE shall <br /> prepare a detailed cost estimate for construction and operation of the <br /> designed facility. The construction cost estimate shall be separate from the <br /> operation cost estimate. The operation cost estimate shall include the entire <br /> estimated operational life of the remedial system, and shall be shown on an <br /> annual basis at present worth. The cost estimates shall be prepared according <br /> to the guidance provided in Reference 10.1. The AE shall submit versions of <br /> this document in accordance with the requirements of Section 4.0 and the <br /> schedule provided in Section 5.0 of this SOW. <br /> 3. 10 Field Data; Certain field data is necessary for design of the <br /> system. The AE shall perform the required field work and collect the data as <br /> described in the approved Remedial Design Work Plan and the following <br /> paragraphs. Where modifications to the existing work plans and SOPs are <br /> required, the AE shall document such modifications through a letter report to <br /> be submitted prior to implementation of the field work. <br /> 3. 10. 1 1Task 14) Injection Wells The AE shall install a well at each <br /> location and depth proposed in the upcoming THAMA engineering report for a <br /> treated water injection well and perform pumping tests to verify aquifer <br /> characteristics. The Groundwater Feasibility Study (Reference 10.10) proposes <br /> six (6) wells for the "A-zone" aquifer and ten (10) wells for the "B & C zone" <br /> aquifers. The AE shall recommend appropriate pumping tests in Task 2 to <br /> evaluate the hydraulic conductivity of the aquifer at each location and depth. <br /> The AE shall compare appropiate field parameters resulting from the actual <br /> Pump tests to those used in design of the injection well network, and make <br /> recommendations for any adjustments to the injection well network which may be <br /> necessary. The completed injection wells shall be incorporated into the <br /> remedial design. <br /> 3.10.2 1Task 15) Field Investigation Report The AE shall prepare an <br /> engineering report fully documenting the field activities performed. The AE <br /> shall evaluate the data and incorporate applicable data into <br /> the design documents developed under this delivery order. <br /> 3.11 (Task 16)-Meetings The AE shall provide two professionals, <br /> thoroughly familiar with the project, at each meeting to be held at DDRWS or <br /> AA-8 <br />