My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_1992
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2900 - Site Mitigation Program
>
PR0506824
>
SITE INFORMATION AND CORRESPONDENCE_1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 2:59:29 PM
Creation date
4/7/2020 2:38:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1992
RECORD_ID
PR0506824
PE
2960
FACILITY_ID
FA0007648
FACILITY_NAME
DDRW - SHARPES
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
01
SITE_LOCATION
850 E ROTH RD BLDG S-108
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
600
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING AND REPORTING - 3 - May 21, 1992 <br /> PROGRAM <br /> Sampling <br /> Constituents Units Frequency <br /> Electrical Conductivity µmhos/cm A <br /> Total Dissolved Solids mg/l A <br /> pH pH units A <br /> Temperature °C A <br /> The following additional measurements shall be made at the appropriate locations during the TPE: <br /> Sampling <br /> Constituents Units Frequency <br /> Total Volume of Water <br /> Treated gallons A <br /> Flow Rate at Time of <br /> Sampling gpm A <br /> Extraction Wells <br /> The extraction well(s) shall be monitored for the following during the TPE: <br /> Sampling <br /> Constituents Units Frequency <br /> Electrical Conductivity µmhos/cm A <br /> pH pH units A <br /> Temperature °C A <br /> Extraction Rate <br /> at Time of Sampling gpm A <br /> Water level ft msl A <br /> PROVE-OUT PHASE (POP) MONITORING <br /> The objectives of this phase are to further characterize the influent and effluent streams, determine <br /> the treatment efficiencies of the treatment system, and further monitor the performance of the <br /> extraction and injection wells. The following sampling frequency schedules will be used for the <br /> various monitoring locations: <br />
The URL can be used to link to this page
Your browser does not support the video tag.