My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_1993-2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2900 - Site Mitigation Program
>
PR0506824
>
SITE INFORMATION AND CORRESPONDENCE_1993-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 3:15:47 PM
Creation date
4/7/2020 2:41:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1993-2003
RECORD_ID
PR0506824
PE
2960
FACILITY_ID
FA0007648
FACILITY_NAME
DDRW - SHARPES
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
01
SITE_LOCATION
850 E ROTH RD BLDG S-108
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
491
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Remedial Design -2- 5 March 1993 <br /> DDRW, Sharpe <br /> install a portion of the RA that may ultimately be needed more for additional <br /> remedial investigation of the waste management units (WMUs) . <br /> However, we acknowledge that AEC is planning to address our known concerns with the <br /> extraction system design. On 4 March 1993, Mr. Craig MacPhee of AEC spoke with <br /> Mr. James Taylor and assured us that pilot holes will be installed and that the logs <br /> will be given to the agencies for approval of extraction well screen lengths. <br /> Therefore, we do not intend to prevent AEC from installing the extraction system for <br /> the Central Area. However, we request that the design of the extraction and <br /> injection systems be discussed as field work progresses and at the next Project <br /> Manager's Meeting tentatively scheduled for the week of 15 March 1993. We believe <br /> that this Meeting is the best forum for AEC to provide us the assurance that the <br /> systems will be designed for maximum efficiency. <br /> If you have any questions, please call me at (916)255-3069 or Mr. James Taylor at <br /> (916)255-3065. <br /> n <br /> CAMILLA WILLIAMS <br /> Engineering Geologist <br /> CKW:cw <br /> cc: Mr. Craig MacPhee, U. S. Army Environmental Center, Aberdeen Proving Ground, <br /> Maryland <br /> CPT Mike Dell 'Orco, U. S. Army Corps of Engineers, Huntsville, Alabama <br /> Mr. Richard Seraydarian, U. S. Environmental Protection Agency, Region IX, San <br /> Francisco <br /> Ms. Tracie Billington, Department of Toxic Substances Control , Region 1, <br /> Sacramento <br /> Mr. Fred Kaufman, Public Health Services of San Joaquin County, Environmental <br /> Health Department, Stockton <br />
The URL can be used to link to this page
Your browser does not support the video tag.