Laserfiche WebLink
Mr. Marshall Cloud <br /> March 22, 2007 <br /> Page 5 <br /> 20.) Page 4-4, section 4.3.2; It should be identified in this section that the <br /> interpretation of 2006 data only occurred from one quarter (3Q06). Typically, <br /> the Annual report compares four quarters of analytical data to the previous <br /> years data in order to make interpretations and conclusions. DTSC is <br /> skeptical in making conclusions about the remedial progress in 2006 based <br /> only on one quarters worth of analytical data. <br /> 21.) Page 4-9, section 4.6.2, first bullet; The sentence states the purpose of <br /> the focused extraction at MW418C and MW437C was to accelerate mass <br /> removal from the areas of highest concentrations. According to page 4-6, <br /> section 4.3.8, focused extraction from MW437C removed less than half the <br /> TCE mass in 2006 compared to when EWCC1 was operating in 2005. <br /> Please describe in the final report how the extraction/treatment system is <br /> being optimized to accelerate mass removal when the interim measure is <br /> only half as effective in mass removal. <br /> 22.) Table 4.3-1; DTSC notes from the report that increases in TCE plume <br /> areas were identified in the B-zone Central Area and all-zones in the North <br /> Balloon. Additionally, the areal extent of PCE plumes increased for the <br /> C-zone in the South Balloon and all-zones in the North Balloon. <br /> 23.) Page 4-25, table 4.5-7; The table shows the Air:Water Ratio for both the <br /> South Balloon and North Balloon treatment plants are operating outside of <br /> the required design ratios of 25-40 cubic feet/cubic feet. Please describe in <br /> the final report whether the Air:Water Ratio at the treatment plants is planned <br /> to be adjusted so the treatment plants can operate within the design <br /> specifications. <br /> If you have any questions or comments regarding this letter, please feel free to contact <br /> me at (916) 255-3713, or e-mail me at pmacnichCcDdtsc cagov. <br /> Sincerely, <br /> f <br /> Peter MacNicholl, P.E. <br /> Remedial Project Manager <br /> Federal Facilities Unit <br /> cc: See DDJC-Sharpe Distribution List. <br />