Laserfiche WebLink
t <br /> CONTENTS OF THIS <br /> PROPOSED ' Purpose of the Proposed Plan that have been <br /> contaminated with <br /> Introduction to In 1996,after DESJC and state and federal a gulato <br /> the Proposed Plan and incorporated public comments on the Proposed Plan,a ROD as <br /> developed and signed for lolls at DDJC-Sharpe.The ROD descri s <br /> Location of DDJC-Sharpe 1 the investigations and cleanup activities that DESK is required <br /> complete at specified sites where soil may have been contamin ed by <br /> Public Comment Period 1 past depot activities. DDJC-Sharpe has been using the ROD to d rect its <br /> environmeCichioroethene <br /> and has implemented its requir ments. <br /> Public Meeting Forthe 1 C s identrfied in the ROD a insubsequenninye ow ek1 all but <br /> Overview of the 2-4 one require no further action(NFA).The remaining site, P-5 (shown in <br /> Proposed Plan red on the map below) will require a remedial action. In accordance <br /> with the ROD,soil vapor extraction (SVE)will be implemented at site <br /> Key DDJC-Sharpe 3 P-5A to protect groundwatpirfiliality <br /> Milestonescontaminated <br /> Five metals sites(shown In green on the map below)have undergone <br /> National Contingency 4 excavation and off-site disposal of contaminated soil or were determined <br /> Plan Criteria to meet cleanup standards without remedial action. However,since the <br /> further action in <br /> Overview of the Proposed 5 the form of land use controls(LUCs)will be necessary to protect human <br /> ROD Amendment health. cause of the addition of LUCs,an amendment to the previously <br /> publishe I ROD is required. <br /> Location and Status 5 The u se of this Proposed Plan for the Amendment to the Record of <br /> of Remedial Action Sites Decision Basewide Remedy for DDJC-Sharpe Site is to give the public <br /> Glossary of 6-7 an oppoi unity to review and comment on the proposed change to the <br /> Terms/Acronyms ROD.Th ROD Amendment will be published as a final document after <br /> public c ments have been received and considered. D will respond <br /> Community 5, 8 to all co ments received during the public comment d.Comments <br /> Participation and resp nses will appear in the Responsivenes mmary section of <br /> the ROD mendment. <br /> Comment Form INSERT in consultation with EPA, DTSC, and RWQCB, <br /> Mailer <br /> 11 <br /> concentrations of metals that remain in soil are protective of human health in <br /> an industrial land use setting. abut not a residential settina. <br /> Location at Status of theDDJU-Sharpe Soil <br /> P-3A <br /> P-1 F p 6A 5 26 <br /> wPSA <br /> g P-1G P-2B <br /> A <br /> y P-1 E c P-4C P-4121 Central Area a North �� St <br /> S-331 <br /> S-29 Balloon <br /> if South S-3w <br /> Balloon P-4A <br /> • *I s- <br /> P-1C 1S.36* �P-2A <br /> •1B;" P-1A <br /> Legend Abbreviations N <br /> o 1,000 <br /> %%/ TCE Sites Requiring NFA W Metals Sites Recommended for LUCs LUC-Land Use Controls SVE- Soil Vapor Extraction i , , <br /> TCE Site with SVE Planned + Soil sites addressed by the Proposed Plan NFA-No FUdherAcllon TCE-Trichloroethene Scale In Feet <br /> Z <br />