My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_2004-2014
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2900 - Site Mitigation Program
>
PR0506824
>
SITE INFORMATION AND CORRESPONDENCE_2004-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 2:56:47 PM
Creation date
4/7/2020 2:44:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
2004-2014
RECORD_ID
PR0506824
PE
2960
FACILITY_ID
FA0007648
FACILITY_NAME
DDRW - SHARPES
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
01
SITE_LOCATION
850 E ROTH RD BLDG S-108
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
continued from page 2 <br /> DDJC-Sharpe Background and Site Characteristics <br /> DDJC-Sharpe is located in San Joaquin County, northeast of groundwater contamination.Investigations at the depot <br /> the City of Lathrop and approximately 9 miles south of the City revealed that contamination of soil and groundwater resulted <br /> of Stockton.The installation—encompassing approximately primarily from industrial cleaning solvents, petroleum fuels, <br /> 720 acres—forms a 0.5-mile-wide(east-west), 2-mile-long metals,and pesticides. <br /> (north-south) rectangle.Current land use at DDJC-Sharpe is <br /> designated as industrial and it is anticipated that the land The DLA serves as the lead federal agency authority for cleanup <br /> use designation will remain industrial in the future.The area activities at DDJC-Sharpe,a federal facility.The United States <br /> surrounding DDJC-Sharpe includes mixed-use light industrial, Environmental Protection Agency(EPA)is the lead regulatory <br /> agricultural,and residential land. Railroad rights-of-way agency,and the California Department of Toxic Substances <br /> parallel the eastern and western depot boundaries. Control(DTSC)and the California Regional Water Quality <br /> Control Board(RWQCB)are regulatory support agencies for <br /> The principal depot mission has been the storage,shipping,and environmental investigation and restoration at the depot. <br /> packaging of general supplies in support of America's Armed <br /> Forces,as well as the maintenance of military equipment. Milestones in the soil cleanup program at DDJC-Sharpe are <br /> These tasks require the use of petroleum hydrocarbon fuels shown below. Please note that the groundwater cleanup <br /> and a variety of other industrial chemicals. Past use and efforts at DDJC-Sharpe are guided by a separate ROD, <br /> disposal practices resulted in the release of these chemicals and no amendments to that ROD are considered in this <br /> into the environment.In 1979, DDJC-Sharpe began conducting Proposed Plan. <br /> environmental restoration activities to address soil and <br /> Key I !JC-Sharpe Milestones for <br /> ® Installation Restoration Program (IRP)initiated to investigate environmental contamination <br /> DDJC-Sharpe placed on the National Priorities List(NPL) Eby EPA i <br /> Federal Facilities Agreement(FFA)signed �by dWB <br /> ® Remedial Investigation/Feasibility Study(RI/FS)completed <br /> Proposed Plan for soil sites published <br /> ® ROD for soil sites signed by DLA, EPA, DTSC, and RWQCB <br /> Pre-design technical summary for soil sites remedial actions completed <br /> Construction of soil vapor extraction (SVE)system completed and SVE operation begun; <br /> metals-contaminated soil excavated and disposed offsite <br /> i i r Two remedial action reports published documenting investigations and cleanup activities at soil sites, <br /> including no further action decisions <br /> r r Two remedial action reports published documenting investigations and cleanup activities, <br /> including no further action decisions at soil sites;SVE operations completed <br /> Initial Five-Year Review completed <br /> i r Response Completion Plan(RCP)published <br /> Additional metals-contaminated soil excavated and disposed off site <br /> i One remedial action report published documenting investigations and cleanup activities at soil sites <br /> including no further action decisions <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.