My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2900 - Site Mitigation Program
>
PR0506824
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 3:00:21 PM
Creation date
4/7/2020 2:49:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506824
PE
2960
FACILITY_ID
FA0007648
FACILITY_NAME
DDRW - SHARPES
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
01
SITE_LOCATION
850 E ROTH RD BLDG S-108
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
533
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• DDJ*acy OU 1 Pesticide Remi diation <br /> Groundwater Extraction Well Installation W rk Plan <br /> 1.0 INTRODUCTION AND 1.4 To determine if the operation of PE -1 and <br /> BACKGROUND PEW-2 combined with EW040AU and <br /> EW041AU can adequately capture the lea Jing <br /> 1.1 This work plan describes the proposed edge of the dieldrin plume, aquifer testing will <br /> groundwater extraction well installation and be performed on the new wells. During th <br /> aquifer testing effort to be conducted at the aquifer testing, water level measurements will be <br /> Defense Distribution Depot San Joaquin collected from temporary piezometers installed <br /> California Tracy Site(DDJC-Tracy). The around PEW-I and PEW-2. Seven temporary <br /> purpose of the proposed extraction wells piezometers will be installed in the Above Upper <br /> (PEW-1 and PEW-2), installed as part of Horizon, and three will be installed in the Upper <br /> DDJC's ongoing Operable Unit(OU) I ground- Horizon. The temporary piezometers will <br /> water remediation efforts, is to provide effective installed using cone penetrometer testing(CPT) <br /> capture of the leading edge of the dieldrin plume procedures. CPT dissipation tests will beper- <br /> that has migrated beneath agricultural land of the formed to estimate the elevation of the top of the <br /> DDJC-Tracy Annex(see Figure 1-1). Above Upper and Upper Horizons. The C <br /> dissipation tests and the CPT logs will be valu- <br /> 1.2 Extraction wells EW040AU,EW041AU, ated to determine a preferred screen interval for <br /> EW042AU, and EW044AU were installed in the piezometers. Drawdown measured in tfie <br /> December 1998 to begin remediation of dieldrin piezometers,emplaced at several radial <br /> in OU 1 groundwater(Radian International, distances from the wells,will provide an <br /> 1999) (Figure 1-1). Specifically,EW040AU and estimate of capture zone width. If drawdown is <br /> EW041AU were installed to minimize migration measured in the Upper Horizon piezomete rs,the <br /> of dieldrin to the DDJC-Tracy Annex property. potential influence of PEW-1 and PEW-2 n the <br /> EW044AU was installed to provide additional Upper Horizon can be characterized. <br /> control of dieldrin migration to the Annex, and <br /> EW042AU was installed in the Solid Waste 1.5 After well installation and aquifer tes ing <br /> Management Unit(SWMU)2/3 area to remove are completed,a report summarizing the r sults <br /> dieldrin from groundwater near the former and providing an estimation of the capture zones <br /> source area(URS,2002). However,results from of PEW-1 and PEW-2 will be prepared. C nsis- <br /> aquifer testing of theses wells in 1999, as tent monitoring of the width of the capture zones <br /> presented in the DDJC-Tracy Site OU I when all pesticide extraction wells are in f all <br /> Groundwater Treatment for Pesticides, Pre- operation requires water level measurements <br /> Design Technical Summary,are insufficient to near the wells in directions that are not do n- <br /> assess the wells zones of capture(Radian gradient from the wells. After an evaluation of <br /> International, 1999 and URS,2002). Therefore, the lithology from the CPT logs and the ac infer <br /> PEW-1 and PEW-2 are proposed for installation test results,some of the temporary piezo ters <br /> in the Annex area between EW040AU and will be converted to permanent piezometei s, and <br /> EW041AU to provide adequate plume capture. the remaining temporary piezometers will be <br /> abandoned. Permanent piezometers are ne ded <br /> 1.3 Well vault installation for PEW-1, PEW-2, to provide water level data points cross-gr idient <br /> EW040AU,EW041AU,EW042AU, and from the extraction wells. Additional pern anent <br /> EW044AU will also be completed under this piezometer locations may be recommende I, if <br /> task order(TO). Installation of extraction system the aquifer testing results conclude that the <br /> pipeline and electrical conduit to connect the six temporary piezometer locations are inapp - <br /> extraction wells to Groundwater Treatment priate for long-term estimation of the capti ire <br /> Plants I and 2(TP 1 and TP 2)will be per- zones of PEW-1 and PEW-2. <br /> formed under a separate TO.The construction of <br /> the extraction system,beginning with the well 1.6 The installation and aquifer testing o <br /> headworks,is described in DDJC-Tracy Site PEW-1 and PEW-2 are tentatively schedu ed for <br /> OU I Pesticide Remedial Design 100% August 2002. The procedures that will be ised <br /> Submittal(URS, 2002). for this work are summarized in the follom ing <br /> KA02237\01J 1_Pest-Rem\final\GW-EW-WrkPln.doc I my 2002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.