Laserfiche WebLink
DDJC-oy OU 1 Pesticide Remediation <br /> Groundwater Extraction Well Installation Work Plan <br /> sections. A more complete discussion of the well • Reference elevation for all depth measure- <br /> construction procedures is presented in the ments; <br /> DDJC-Sharpe/Tracy Comprehensive Field Work <br /> Plan (URS,2001). • Name of driller; <br /> 2.0 WELL INSTALLATION • Name and signature of the field geologist <br /> ACTIVITIES preparing the log;and <br /> 2.1 Pre-Well Installation Activities • Name and signature of California registered <br /> geologist who provided oversight. <br /> Before any drilling or well installation activities <br /> are initiated, a well installation permit will be 2.2.2 The field geologist will record an as-built <br /> obtained from San Joaquin County Public diagram of each extraction well during the <br /> Health Services,Environmental Health Division, construction of the well. Furthermore,a detailed <br /> as well as clearance of all aboveground and log will be kept during the development of each <br /> below ground utility hazards. well. The type of information that will be <br /> included in the log is discussed in the DDJC- <br /> 2.2 Field Documentation Sharpe/Tracy Comprehensive Field Work Plan <br /> (URS, 2001). Results will be documented in the <br /> 2.2.1 The URS field geologist will maintain an forthcoming Comprehensive Engineering <br /> accurate log for each boring drilled. At a Technical Memorandum for TO 37. <br /> minimum, the log shall include: <br /> 2.3 Drilling Requirements <br /> • Name of the project and site; <br /> For the proposed extraction wells, an 8-to <br /> • Boring number; 9-inch diameter boring will initially be drilled <br /> with 4-1/4-inch internal diameter hollow-stem <br /> • Date drilled; augers to obtain a continuous core for lithologic <br /> logging. Upon completion of drilling and <br /> • Location of the boring; logging,the boring will then be reamed to <br /> 14 inches for the installation of the 6-inch- <br /> • Type of drill rig; diameter extraction well casing. <br /> • Size and type of drilling method used; 3.0 WELL SPECIFICATIONS <br /> • Depth at which groundwater was first The extraction wells will be installed using <br /> encountered; guidelines set forth in the DDJC-Sharpe/Tracy <br /> Comprehensive Field Work Plan (URS,2001). <br /> • Depth to the static water level and changes The well design specifications of the proposed <br /> in static water level with hole depth; extraction wells are provided in Table 3-1.A <br /> diagram of a typical extraction well design is <br /> • Total depth of the hole; shown in Figure 3-1. Figure 3-1 is intended to <br /> show the planned subsurface well construction <br /> • Depth or location of any problems details only; surface completion details are <br /> encountered(i.e., heaving sands); provided in the extraction well design summary <br /> in the DDJC-Tracy Site OU I Pesticide <br /> • Lithologies of soil layers encountered; Remedial Design 100%Submittal(URS,2002). <br /> All wells(i.e., headworks and valves)will be <br /> completed in concrete vaults with bolted lids. <br /> K902237\01) 1_Pest-RemVinal\GW-EW-WrkPln.dm 2 July 2002 <br />