My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2900 - Site Mitigation Program
>
PR0506824
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 3:00:21 PM
Creation date
4/7/2020 2:49:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506824
PE
2960
FACILITY_ID
FA0007648
FACILITY_NAME
DDRW - SHARPES
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
01
SITE_LOCATION
850 E ROTH RD BLDG S-108
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
533
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• DDAacy OU 1 Pesticide Remit diation <br /> Groundwater Extraction Well Installation Wc rk Plan <br /> 4.4 Bentonite Seal 5.0 POST-WELL-INSTALLATION <br /> ACTIVITIES <br /> The extraction wells will be constructed with a <br /> bentonite seal placed above the filter pack to 5.1 Extraction Well Development <br /> protect the filter pack during grouting.The <br /> bentonite seal will consist of bentonite pellets or Each extraction well will be developed after well <br /> chips. Once the seal is in place,the interval will casing installation. Well development pr -- <br /> be hydrated for a minimum of 30 minutes, dures will follow those outlined in the DD.'C- <br /> before grouting occurs. Guidelines for the Sharpe/Tracy Comprehensive Field Work Ian <br /> installation of the bentonite seal are presented in (URS,2001). Each well will be bailed wit' a <br /> the DDJC-Sharpe/Tracy Comprehensive Field sand-pump bailer to remove fine sand insi a the <br /> Work Plan (URS, 2001). well casing; bailing will continue until fin - <br /> grained sediment removed from the well <br /> 4.5 Cement Grout decreases to less than an estimated volume of <br /> 1 ounce of sediment in one bailer load. The well <br /> A cement grout will be used to fill the annular will then be surged for at least 30 minutes 3r <br /> space above the hydrated bentonite seal.Cement until the amount of sediment entering the well <br /> grout will consist of Type 11 Portland cement decreases to an amount deemed acceptable to the <br /> with 3 pounds of powdered non-beneficiated field geologist.Well development data to lie <br /> bentonite and 7 gallons of water per 94-pound recorded will include field measurement of pH, <br /> sack of cement. The cement grout will be temperature, specific conductivity,turbidity <br /> mechanically mixed with a paddle-type mixer data,the total number of well volumes pur ed <br /> and then tremied in place. No accelerator will be from the well during development, and the <br /> added to the grout. Guidelines for the installa- average pumping rate during development To <br /> tion of the grout seal are presented in the DDJC- comply with regulatory standards for addressing <br /> Sharpe/Tracy Comprehensive Field Work Plan potential pesticide impacts, development water <br /> (URS,2001). will require treatment by carbon absorption and <br /> air stripping methods already in place at th site. <br /> 4.6 Wellheads Groundwater removed during developmen will <br /> be conveyed through a 2-inch diameter <br /> Extraction wells and well headworks will be discharge hose to a tank for temporary stot age to <br /> installed to match wells currently in use at allow settling of fine sands. The groundw er <br /> DDJC-Tracy. Well headworks will be contained will be transferred to TP 2 by pumping the water <br /> in a 5-foot by 5-foot concrete vault.Protective out of the holding tank and through a carbon <br /> guard posts will be placed at each corner of the adsorption vessel located near EW022A, <br /> vault. Details describing the wellhead construc- approximately 600 feet south of TP 2.The water <br /> tion are addressed in the DDJC-Tracy Site OU I will then be conveyed to TP 2 through the <br /> Pesticide Remedial Design 100%Submittal existing groundwater conveyance pipeline <br /> (URS, 2002). <br /> 5.2 Well Location Surveying <br /> 4.7 Investigation-Derived Waste <br /> Horizontal coordinates will be determined to the <br /> Investigation-derived waste(IDW) will be closest 1.0 foot and referenced to the State Plane <br /> managed in accordance with the procedures Coordinate System,Zone 3,North Annericin <br /> described in the DDJC-Sharpe/Tracy Compre- Datum of 1983. Ground surface and top-o <br /> hensive Field Work Plan(URS,2001)and the casing elevations will be obtained at the <br /> DDJC-Sharpe/Tracy Waste Management Plan extraction wells to the closest 0.1 foot and 0.01 <br /> (Radian International,2000). foot,respectively. These elevations will be <br /> referenced to the National Geodetic Vertical <br /> Datum of 1988. <br /> K:\02237\OU I_Pest-RemVnal\GW-EW-WrkPln.dm 7 June 2002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.