My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2900 - Site Mitigation Program
>
PR0506824
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 3:00:21 PM
Creation date
4/7/2020 2:49:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506824
PE
2960
FACILITY_ID
FA0007648
FACILITY_NAME
DDRW - SHARPES
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
01
SITE_LOCATION
850 E ROTH RD BLDG S-108
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
533
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DDJC*y OU 1 Pesticide Remediation <br /> Groundwater Extraction Well Installation Work Plan <br /> 5.3 Groundwater Sample 6.1.2 The observation piezometers will be <br /> Collection placed at distances of approximately 32 and 65 <br /> feet to the east and west of PEW-I and PEW-2. <br /> Water samples will be collected from the The three Upper Horizon piezometers will be <br /> extraction wells as part of the annual monitoring installed adjacent to three of the seven Above <br /> program. Samples will be collected and analyzed Upper Horizon piezometers (see Figure 1-1). <br /> for volatile organic compounds by U.S. EPA The piezometers will be aligned parallel to the <br /> Method SW8260B, organochlorine pesticides by east-west access road to the immediate north of <br /> U.S.EPA Method SW8081A, and carbamate PEW-1 and PEW-2. This alignment was selected <br /> and urea pesticides by U.S. EPA Method 8321A. to evaluate the widths of potential capture zones <br /> Sample collection will be performed in accord- for each well at the test-pumping rate. Final <br /> ance with procedures outlined in the DDJC- piezometer placement and distances will be <br /> Sharpe/Tracy Comprehensive Field Work Plan determined by field conditions. <br /> (URS, 2001). <br /> 6.1.3 A CPT drill rig will be used to construct <br /> 5.4 Data Management 1-inch inside diameter piezometers with the <br /> materials described in the following paragraphs. <br /> 5.4.1 All data collected from location surveying <br /> and groundwater sample analytical results 6.1.4 The piezometer casing will be 1-inch <br /> collected under TO 37 will be incorporated into inside diameter Schedule 40 PVC pipe with <br /> the DDJC-Sharpe/Tracy Environmental Data flush threads. The casing surface will be free of <br /> Management System(EDMS)database. Data solvents,oils,grease,paint, and dirt and will be <br /> receipt, data loading, and the data quality control certified clean from the factory or steam-cleaned <br /> will be performed under TO 49. on site prior to installation. Sections of casing <br /> will be received from the supplier wrapped in <br /> 5.4.2 Electronic versions of all documents(i.e., polyethylene protective wrappers with sealed <br /> CD-ROMs) will be prepared and submitted ends to limit exposure to potential contaminants. <br /> according to the procedures described in the Casing will not be removed from the wrapping <br /> Electronic Document Submittals (#RD-ST-002) until immediately before it is to be placed in the <br /> for the DDJC-Sharpe/Tracy program. boring. <br /> 6.0 TEMPORARY PIEZOMETER 6.1.5 Each piezometer screen will consist of a <br /> INSTALLATION ACTIVITIES 1-inch nominal diameter, Schedule 40 PVC <br /> continuous slot screen with flush threads. The <br /> 6.1 Temporary Piezometer precise screen depth and slot size will be <br /> Installation determined in the field based on the lithology <br /> encountered and the results of the CPT <br /> 6.1.1 Ten temporary observation piezometer dissipation tests.The screen will be of sufficient <br /> wells(TPZ1 through TPZ10, see Figure 1-1) size and design to hold back and support the <br /> will be installed according to the general filter pack and in situ soils surrounding the <br /> procedures described in the DDJC-Sharpe/Tracy screen.The piezometer screen will include a <br /> Comprehensive Field Work Plan (URS, 2001) "pre-packed"filter pack along the full length of <br /> and as modified by this work plan. Seven the screen.The piezometer will have a <br /> temporary piezometers will be completed in the bentonite/grout seal above the filter pack that <br /> Above Upper Horizon with total depths ranging will be hydrated after emplacement. <br /> from approximately 20 to 40 feet below ground <br /> surface (bgs),and three temporary piezometers 6.2 Piezometer Location SurV@Vinq <br /> will be completed in the Upper Horizon with <br /> total depths ranging from approximately 40 to Horizontal coordinates of temporary piezome- <br /> 60 feet bgs. ters will be determined to the closest 1.0 foot <br /> and referenced to the State Plane Coordinate <br /> K:\02237\OU 1Pest-Rem\fina1\GW-EW-WrkP1n.dm $ June 2002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.