My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2900 - Site Mitigation Program
>
PR0506824
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 3:00:21 PM
Creation date
4/7/2020 2:49:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506824
PE
2960
FACILITY_ID
FA0007648
FACILITY_NAME
DDRW - SHARPES
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
01
SITE_LOCATION
850 E ROTH RD BLDG S-108
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
533
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br /> DDJ*Acy OU 1 Pesticide Reme liation <br /> Groundwater Extraction Well Installation Woi k Plan <br /> System, Zone 3,North American Datum of pump test and the start of the second 24-ho it <br /> 1983. Ground surface elevations will be pump test. <br /> obtained to the closest 0.1 foot and 0.01 foot, <br /> respectively. These elevations will be referenced 6.3.5 To comply with regulatory standard for <br /> to the National Geodetic Vertical Datum of addressing potential pesticide impacts,ground- <br /> 1988.If temporary piezometers are converted to water generated during aquifer testing will <br /> permanent piezometers, the top-of-casing require treatment by carbon adsorption and air <br /> elevations will also be measured and referenced stripping methods already in place at the sil e. To <br /> to the National Geodetic Vertical Datum of maximize the pumping rates used during t step <br /> 1988. and constant rate aquifer tests, groundwate <br /> generated during the tests will be conveyed <br /> 6.3 Aquifer Testing through a 2-inch diameter discharge hose to a <br /> tank for temporary storage. The groundwa r <br /> 6.3.1 The set-up and performance of the aquifer will be simultaneously pumped out of the <br /> testing will follow the procedures outlined in the storage tank and through a carbon adsorption <br /> DDJC-SharpelTracy Comprehensive Field Work vessel located near EW022A,approximate) 600 <br /> Plan(URS, 2001)and as modified in this work feet south of the TP 2. The water will then be <br /> plan. Pressure transducers will be placed in each conveyed to TP 2 through the existing <br /> of the temporary piezometers during the test. groundwater conveyance pipeline. <br /> Additional transducers will be installed in <br /> existing nearby wells(i.e.,EW040AU and 6.3.6 Drawdown and recovery data from t oth <br /> EW041AU)to supplement the water level pumping tests will be evaluated using <br /> measurements collected in the observation AQTESOLVTm to estimate aquifer paramet rs. <br /> piezometers.Water levels in all instrumented In addition to analysis methods and procedures <br /> wells will be backed up with manual measure- outlined in the DDJC-Sharpe/Cracy Comp - <br /> ments.Well EW043AU will be used during the hensive Field Work Plan(URS,2001),the <br /> tests to provide background water level trend drawdown data should be evaluated with th <br /> data. Neuman (1975)analysis for wells with delayed <br /> yield.The Neuman method is not described in <br /> 6.3.2 Barometric pressure changes and the DDJC-Sharpe/Cracy Comprehensive Fi ld <br /> potential influence on groundwater levels will be Work Plan but should be considered for thi test <br /> evaluated by recording the air pressure using a because delayed yield may occur near the <br /> barometric probe.The probe will collect air pumping well.The Neuman method of analysis <br /> pressure data at the same measurement was developed for testing of wells construci ed in <br /> frequency as the water levels. anisotropic aquifers that are unconfined, wl ich <br /> is the aquifer condition expected at the loca ions <br /> 6.3.3 Separate stepped pumping rate tests on of PEW-1 and PEW-2. This analysis metho <br /> PEW-1 and PEW-2 will consist of at least four employs curves representing drawdown ver us <br /> progressively higher pumping rates with a time that allow analysis of both the initial y eld <br /> minimum duration during each step of 60 and the delayed yield from an unconfined <br /> minutes. Specific procedures for stepped aquifer during an aquifer test. <br /> pumping tests are outlined in the DDJC- <br /> Sharpe/Tracy Comprehensive Field Work Plan 6.4 Temporary Piezometer <br /> (URS,2001). Abandonment <br /> 6.3.4 Following the stepped pumping rate tests, 6.4.1 Upon completion of the aquifer tests the <br /> 24-hour constant rate pumping tests will be temporary observation piezometers will either be <br /> conducted separately on PEW-1 and PEW-2, abandoned or converted to permanent piez e- <br /> with a delay of 24 hours to allow water level tern,depending on the results of the aquifer tests. <br /> recovery between the end of the first 24-hour Abandonment will be performed according to <br /> the general procedures described in the DD C- <br /> K102237\OU I—Pest-Rem\fnal\GW-EW-WrkPIn.duc 9 Juj e2002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.