My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2900 - Site Mitigation Program
>
PR0506824
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 3:00:21 PM
Creation date
4/7/2020 2:49:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506824
PE
2960
FACILITY_ID
FA0007648
FACILITY_NAME
DDRW - SHARPES
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
01
SITE_LOCATION
850 E ROTH RD BLDG S-108
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
533
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br /> conduct a total threshold limit concentration test for nickel <br /> and zinc on three composite samples from the wall sections. For <br /> purposes of these tests a hand auger will be used to gather soil <br /> samples to a depth of ten feet. <br /> One additional test will be done on a composite of five samples <br /> taken from Grids G and E in the corner of the impoundment. <br /> The first verbal report on the lab results will be available on <br /> November 17th. A second lab test will then be ordered and a <br /> verbal report will be available on this test on December 1st. <br /> Assuming the second test is sufficient, a written report will be <br /> issued on December 8th. We are allowing the lab two weeks to <br /> conduct the tests from the time they receive the samples. <br /> 3. A winterization plan will be submitted on or before December 8, <br /> 1989. <br /> 4. We will submit a schedule for revising the closure plan one <br /> month after we receive the final lab test report on the side <br /> walls and Grids G and E on the bottom of the impoundment. <br /> Therefore, if we receive the report on December 8th, the <br /> schedule for revising the closure plan will be submitted to you <br /> by January 8th. <br /> The above schedule, in my estimation, is tight but attainable. If, <br /> for any reason, it appears that we will not be able to meet the stated <br /> deadlines then I will let you know. Certainly, if you have questions <br /> about the schedule, give me a call . <br /> Thanks again for your support during our meeting. <br /> Sincerely, <br /> DALLAS CORPORATION <br /> Alan R. Bashor <br /> Vice President <br /> Human Resources <br /> ARB:db <br /> cc: C. Curtis Carter <br /> Overhead/Lodi Door Company <br /> 1220 E. Victor Road <br /> Lodi , CA 95241 <br />
The URL can be used to link to this page
Your browser does not support the video tag.