Laserfiche WebLink
• Drilling activities shall stop when weather conditions indicate that lightning is possible <br /> 3.3 GROUND-WATER MONITORING WELL CONSTRUCTION <br /> ' Borings for monitoring wells will be drilled with 10-inch outside diameter, hollow-stem <br /> augers Each boring will be augered to a depth of approximately 5 feet below the water table <br /> Monitoring wells will be installed in accordance with guidelines described in the attached Field Work <br /> Plan <br /> 1 <br /> Monitoring wells will be allowed to stabilize for at least 48 hours after well development is <br /> ' completed before ground-water sampling activities are initiated <br /> Potential hazards and control measures for monitoring well installation and ground-water <br /> sampling activities are the same as described for borehole drilling A field activities list and <br /> ' associated PPE levels is provided in Attachment H <br /> 1 <br /> 1 <br /> Cr0162 HSP <br /> 044-0162UrATRI.O 5193 10 <br /> 1 <br />