Laserfiche WebLink
D Zone: There is one D Zone well installed at the former Time Oil terminal, <br /> TO/WC-21), located in the southwestern portion of the site. Laboratory analytical results <br /> for the February 2012 groundwater monitoring event reported benzene at an estimated <br /> concentration of 0.36 pg/L, TPH-d at 170 µg/L, and MTBE at an estimated concentration <br /> of 0.19 pg/L, in the sample collected from the D Zone well. <br /> Site Characterization Work Plan,Final, May 18,2012 <br /> 1007-012.002 2-10 <br />