Laserfiche WebLink
REFERENCES <br /> EMCON, 1993 Interim Pollution Assessment, Port of Stockton Bulk Fuel Terminals, <br /> Stockton, California, EMCON Associates,February. <br /> EMCON, 1994 Stockton Terminals Committee Phase II Pollution Investigation <br /> Assessment, EMCON Associates, September. <br /> IT, 2001 Pilot Testing Work Plant, Stockton Fuel Distribution Terminals, Port of <br /> Stockton, Stockton, California, IT Corporation, September 11. <br /> Levine-Fricke, 1988 Investigation of Subsurface Fuel Hydrocarbons, Southern Pacific <br /> Pipelines, Inc., Levine Fricke,March 23. <br /> SECOR, 2002 Off-Site Assessment Report, Port of Stockton, Stockton, California, <br /> SECOR International Incorporated, December 20. <br /> SECOR, 2004 Corrective Action Plan, Stockton Terminals Technical Committee <br /> Facilities, Port of Stockton, Stockton, California, SECOR International <br /> Incorporated, August 30. <br /> Stantec, 2011 Well Destruction and Replacement Report, Former Time Oil Terminal, <br /> Port of Stockton, Stockton, California (Draft), Stantec Consulting Corporation, <br /> July 25. <br /> Stantec, 2012 Fourth Quarter and 2011 Annual Site Status, Groundwater Monitoring <br /> and Remedial Summary Report, Stockton Terminals Technical Committee <br /> Facilities, Port of Stockton, Stockton, California, Stantec Consulting Corporation, <br /> February 1. <br /> Time Oil, 1988 Technical Report, Stockton Terminal Investigation, Time Oil Co., <br /> April 13. <br /> Tracer, 1988 Tracer Leak Test of Three Underground Pipe Lines at the Stockton Station, <br /> Stockton, California, (Appendix to Levine-Fricke 1988 Report), Tracer Research <br /> Corporation, March 1988 <br /> Woodward-Clyde Consultants, 1987 Piezometer Installation Permit, Port of Stockton, <br /> Stockton, California, Woodward-Clyde Consultants, January 23. <br /> Site Characterisation Work Plan,Final, May 18,2012 <br /> 1007-012.002 ] <br />