Laserfiche WebLink
. Safety Practices for Excavation Operation <br /> ' 1 Before commencement of excavation in the vicinity of overhead <br /> electrical lines operator shall walk around equipment and <br /> verify a minimum of 20 feet clearance be maintained Any <br /> questions regarding appropriateness of excavation location <br /> should be brought to the attention of the On-site Safety <br /> ' Coordinator <br /> 2 Safety check of equipment will be performed by the delegated <br /> ' On-site Safety Coordinator <br /> 1 <br /> • <br /> 1 A <br /> r <br />