Laserfiche WebLink
PUBLIC HEALTH SERVICES Jk,-,SAN JOAQUIN COUNTYENVIRONMENTAL HEALTH DIVISION Karen Furst, M D , M PH , Health Officer304 East Weber Avenue, Third Floor • Stockton, CA 95202 <br /> ' 209/468-3420 <br /> Jeff Hopkins NOV 14 2000 <br /> ' Western oil & Spreading Inc <br /> PO Box 709 <br /> Martinez, CA 94553 <br /> MEMORANDUM <br /> ' Re Western Oil and Spreading Site Code 1927 <br /> 19256 N Hwy 99 <br /> Acampo,CA 95220 <br /> ' This letter is a memorandum of the telephone conversation with your consultant Daniel Barber on November <br /> 13,2000 <br /> m San Joaquin County Public Health Services,Environmental Health Division(PHS/EHD) expressed that <br /> the pre-packed monitoring well as proposed in Workplan far Sod Gma-rdturrer G7azraae=ataon(the work plan) <br /> dated October 19,2000 prepared by D K Barber P E &Associates (Barber) does not meet San Joaquin <br /> Counry Well Standards,section 4 7 4,which stated the width thickness of the annular seal has to be at least <br /> two inches or thicker Submit a work plan addendum for a properly designed morutoruig well that meets <br /> San Joaquin County Well Standards to this office no later November 17,2000 <br /> o The current well permit application for the Geoprobe portion of the work plan submitted by Barber Ras <br /> not signed by the 057 licensed contractor,Fisch Environmental (Fisch) PHS/EHD also reminded <br /> Barber that a separate well perrrut application and additional fee of$8900 must be submitted to this office <br /> ' if the monitoring well is to be installed by a different G57 contractor than Fisch Submit an additional <br /> well pemut application and appropriate fee(if required)to this office by November 24,2000, <br /> * Barber agreed to analyze both sod and groundwater samples for Total Petroleum Hydrocarbon(TP"- <br /> ' Extractable as Diesel by EPA Method 8015M,TPH as Kerosene by EPA Method 8015K TPI-1-Pursuable <br /> as Gasohne by EPA Method 8015M,and Benzene,Toluene,Ethylbenzene,and Total Xylenes (BTEX <br /> collectively) by EPA Method 8020,as recommended by P1rni/E1 ID in a letter dated November 9,2000 <br /> • PHS/EHD agreed to extend the schedule to perform the Geoprobe portion of the work plan from the <br /> week of November 20th to the week of November 271h <br /> ' Barber stated that he might have difficulties in obtauung a G57 licensed contractor to install the <br /> monitoring well on a short notice PHS/EHD highly suggested Barber to start scheduling a G57 licensed <br /> contractor to do the work now PHS/END requires the monitoring well be installed by December 15, <br /> ' 2000 Asa responsible parity,you are responsible in meeting PHS/EHD directives <br /> Jeffrey Wong,RENS <br /> 1 <br /> LOP/Site Mitigation Unit IV <br /> r c RWQCB,Central Valley Region- Marry Hartzell <br /> C Daniel K Barber- 623 Camellia Way,Lodi 95242 <br /> A Di%ision of S-in Joaquin County Heilth Care Ser%ices <br />