Laserfiche WebLink
r F <br /> r r � <br /> PUBLIC HEALTH SERVICES (klroR <br /> SAN JOAQUIN COUNTYENVIRONMENTAL HEALTH DIVISION AKaren Furst, M D , M P.H , Health Officer304 East Weber Avenue, Third Floor • Stockton, CA 95202 <br /> 209/468-3420 <br /> Jeff Hopkins Nov 0 9 2000 <br /> Western Oil & Spreading Inc . <br /> PO Box 709 <br /> Martinez, CA 94553 <br /> I <br /> MEMORANDUM <br /> Re Western Oil and Spreading Site Code 1927 <br /> 19256 N Hwy 99 <br /> ' Acampo, CA 95220 <br /> This letter is a memorandum of the telephone conversation with you on November 8, 2000 <br /> San Joaginn County Public Health Services, Environmental Health Division (PHS/EHD) <br /> ' infonned you that the Workplan for Soil Grxaxfeuter Cliaraaxerrzatzon(the work plan) dated <br /> October 19, 2000 prepared by D K Barber P E &Associates (Barber) is inadequate The <br /> work plan failed to provide any information on what chemicals are to be analyzed for in the <br /> collected samples The work plan also failed to specify the analytical methods to be used <br /> PHS/EHD has repeatedly tried to contact Barber for comment PHS/EHD has not been <br /> able to reach Barber to date <br /> In the same telephone conversation, PHS/EHD recommended using the previously <br /> subrrutted Primal Workplan; Pherse II Fidd IrmstWnon dated February 16,2000,prepared by <br /> ' Klemfelder as a guide to make up for the missing elements of the work plan by Barber The <br /> work plan prepared by Klemfelder was approved by PHS/EHD but was never <br /> implemented The Kleinfelder work plan proposed analyzing soil and groundwater samples <br /> for Total Petroleum Hydrocarbon (TPH) -Extractable as Diesel by EPA Method 8015M, <br /> TPH as Kerosene by EPA Method 8015M, TPH-Purgeable as Gasoline by EPA Method <br /> 8015M, and Benzene, Toluene, Ethylbenzene, and Total Xylenes (BTEX collectivel)) by <br /> ' EPA Method 8020 PHS/EHD expressed to you that the Barber work plan would be j <br /> acceptable if these components as described in the Klemfelder work plan are followed <br /> i <br /> ' PHS/EHD confirmed with you that the deadline to implement the proposed work is the <br /> week of Nw,ember 20,2000 <br /> JeffreyV4ng, RE HS <br /> LOP/Site Mitigation Unit IV <br /> I� c RWQCB, Central Valley Region — Marty FlartzeIl <br /> C Daniel K Barber— 623 Camellia Way, Lodi 95242 <br /> A Di%ision of San Joaquin Counts Health Care Ser%ices <br />