My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005447
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
19256
>
2900 - Site Mitigation Program
>
PR0540323
>
ARCHIVED REPORTS_XR0005447
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:50:27 PM
Creation date
4/8/2020 2:36:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005447
RECORD_ID
PR0540323
PE
2950
FACILITY_ID
FA0023049
FACILITY_NAME
TELFER HIGHWAY TECHNOLOGIES
STREET_NUMBER
19256
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
CURRENT_STATUS
01
SITE_LOCATION
19256 N HWY 99
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC HEALTH SERVICES ,oAQurlyCo <br /> SAN JOAQUIN COUNTY Z g- <br /> ENVIRONMENTAL HEALTH DIVISION ` <br /> Karen Furst, M D , M PH , Health Officer <br /> 304 East Weber Avenue, Third Floor • Stockton, CA 95202 QL'FOR��P <br /> 209/468-3420 <br /> Jeff Hopkins SEP 2 2 2000 <br /> ' Western Cil & Spreading Inc. <br /> PO Box 709 <br /> ' Martinez, CA 94553 <br /> Re Western Ch1 and Spreading Site Code 1927 <br /> 914Hii12 . wy <br /> Acampo, CA 95220 <br /> In a letter dated August 14, 2000,San Joaquin County Public Health Services, <br /> Environmental Health Division (PHS/EHD) agreed to your request to extend the deadline <br /> from August 15, 2000 to October 1, 2000 to implement the work to investigate the <br /> groundv,ater contamination as proposed in Proposal Workplan; Phase II Fred Inustigation(the <br /> work plan) dated February 16, 2000, prepared by Kleinfelder In a telephone conversation <br /> on September 18, 2000, your consultant Dan Barber expressed that the extended-deadline to <br /> implement the work could not be met Dan further expressed that he has questions about <br /> the work plan and requested a meeting with PHS/EHD <br /> A meeting was held at PHS/EHD Conference Room on September 19, 2000 Attending the <br /> meeting were you representing the responsible party, Dan Barber,Jeffrey Wong and Dot <br /> Lofstrom representing PHS/EHD Summaryof the meeting is as follows <br /> ' • PHS/EHD still requires the installation of the morutonrig well as proposed in the work <br /> plan A full seasonal (4 quarters) of sampling is required as a part of the groundwater <br /> contamination investigation <br /> • Modify the scope of the work plan to include 3 additional borings utilizing direct-push <br /> ' technology(Geoprobe) in the vicinity of boring#4 (B-4) The purpose of the three <br /> additional bonngs is to define the lateral extent of the groundwater contamination <br /> ' • Contingency to install additional borings to define the extent of the groundwater <br /> contamination <br /> i One of the Geoprobe bonngs downgradient should extend into the ground water <br /> at approximately 50 feet below surface grade (bsg) to collect a grab groundwater sample <br /> The regional groundwater flow gradient estimated to be north north-east and depth to <br /> water are based on San Joaquin County Flood Control and Water Conservation District <br /> Lines of Equal Depth publication for 1998 and groundwater information of Victor Fine <br /> A Dn:sion of S-in]o-iquin Counts Health Care Ser%ices <br />
The URL can be used to link to this page
Your browser does not support the video tag.