My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005448
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
19256
>
2900 - Site Mitigation Program
>
PR0540323
>
ARCHIVED REPORTS_XR0005448
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:50:27 PM
Creation date
4/8/2020 2:37:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005448
RECORD_ID
PR0540323
PE
2950
FACILITY_ID
FA0023049
FACILITY_NAME
TELFER HIGHWAY TECHNOLOGIES
STREET_NUMBER
19256
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
CURRENT_STATUS
01
SITE_LOCATION
19256 N HWY 99
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 4 PROJECT CONTROLS <br /> 41 Health and Safety Plan <br /> The attached Health and Safety Plan includes general and specific safety orders as well as <br /> a site specific listing of responsibilities and contacts The Appendix A, Health and safety <br /> Plan will be reviewed by all site personnel and initialed <br /> 4.2 Work Schedule <br /> Scheduling of characterization work has considered the following The source of additional <br /> ' contaminants has been removed Equipment and manpower resources are available at <br /> present Work will be performed by WO&S using subcontracted equipment and manpower <br /> under the direction of D K Barber P E and Associates Technical guidance and sampling <br /> will be carred out by a licensed civil engineer responsible to WO&S <br /> Following agency review, comments, and approval of the workplan, site layout, <br /> underground utility location, and well drilling permit application will commence immediately <br /> Borings and monitoring well construction tentative scheduling is for mid <br /> November 2000 with duration to be two to six weeks depending upon extent of <br /> ' bonngs, laboratory findings and weather Two weeks turnaround time for all state <br /> certified laboratory testing is anticipated unless quicker turnaround time would benefit the <br /> ' project, in which case, turnaround time may be shortened at greater cost <br /> An interim Phase II report will be prepared by D K Barber P E &Associates for forwarding <br /> ' to the overseeing agency with information copy as required by WO&S after field work is <br /> completed The report will be amended quarterly as monitoring well data is collected The <br /> target completion date of all sampling at the Acampo Plant Site is December 30, 2001 <br /> Completion date will be highly dependent upon weather delays and any further testing <br /> incurred after planned Phase II characterization <br /> • 4-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.