My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005448
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
19256
>
2900 - Site Mitigation Program
>
PR0540323
>
ARCHIVED REPORTS_XR0005448
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:50:27 PM
Creation date
4/8/2020 2:37:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005448
RECORD_ID
PR0540323
PE
2950
FACILITY_ID
FA0023049
FACILITY_NAME
TELFER HIGHWAY TECHNOLOGIES
STREET_NUMBER
19256
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
CURRENT_STATUS
01
SITE_LOCATION
19256 N HWY 99
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 1 4.3 Budget and Cost Controls <br /> Budget and cost control information will be developed and maintained internally by WO&S <br /> 1 for possible eventual submittal for reimbursement All cost information is considered <br /> confidential <br /> 4.4 Remediation Goals <br /> Soil and groundwater remediation goals will be identified following determination of affected <br /> water bodies' beneficial uses and impact that may be expected with various remediation <br /> and/or acceptance options <br /> 45 Additional Permits <br /> San Joaquin Valley Unified APCD emission standards will not be violated during the <br /> testing or remediation process A well drilling permit from San Joaquin County PHS/EHD <br /> will be required for each parcel bored, signed by the drilling contractor <br /> 46 Final Report <br /> The Final Report will be prepared under the guidance of a licensed Civil Engineer to <br /> support a request for final closure consistent with Tri-Regional Guidelines The report will <br /> include <br /> (1) analytical results from soil and water samples during the Phase Il characterization <br /> stage <br /> (2) figures delineating the actual lateral and vertical extent of impacted soil <br /> (3) a discussion of risk based remediation factors <br /> ' (4) chain-of-custody records for certified analytical analysis <br /> (5) evaluation of the analytical results and a discussion of the <br /> findings of exploratory and possible remediation phases <br /> (6) recommendations incorporating findings leading to the site's closure <br /> Two copies will be forwarded to the overseeing agency or as requested <br /> 4-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.