My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005448
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
19256
>
2900 - Site Mitigation Program
>
PR0540323
>
ARCHIVED REPORTS_XR0005448
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:50:27 PM
Creation date
4/8/2020 2:37:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005448
RECORD_ID
PR0540323
PE
2950
FACILITY_ID
FA0023049
FACILITY_NAME
TELFER HIGHWAY TECHNOLOGIES
STREET_NUMBER
19256
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
CURRENT_STATUS
01
SITE_LOCATION
19256 N HWY 99
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Safety Practices for Drill Rig Operations <br /> In addition, the following precautions shall be adhered to by the drill rig operator <br /> 1 Before raising the drill ng mast in the vicinity of electrical power <br /> lines, the operator shall walk completely around the drill rig <br /> to determine the distance of the rig to the nearest power <br /> line when the mast is being raised (which should be <br /> greater than 20 feet) Any questions regarding the <br /> appropriateness of a drilling location should be brought to <br /> ' the attention of the On-site Safety Coordinator <br /> 2 Before drilling begins, the location must be adequately cleaned <br /> and leveled to accommodate the drill rig <br /> 3 Housekeeping Suitable storage for all tools, materials, and <br /> ' supplies shall be provided Pipe, drill rods, casings, augers <br /> and similar drilling tools shall be stacked in an orderly <br /> manner to prevent roiling, spreading, or sliding <br /> ' 4 Work areas and drilling platforms shall be kept free of materials, <br /> obstructions, and substances that could cause a surface to <br /> become slick or otherwise hazardous <br /> 5 After stabilizing and leveling the drill rig, all unnecessary personnel <br /> ' should be cleared from the area immediately to the rear <br /> and the sides of the drill mast before it is raised <br /> 6 Augers shall be used consistent with manufacturer's <br /> recommended methods of securing the auger to the power <br /> coupling Additionally, the operator and tool handler shall <br /> establish a safe system of responsibilities for the drilling, <br /> auger connecting and disconnecting, and auger fork <br /> insert/removal <br /> 7 Augers shall only be cleaned when the drill rig is in neutral and the <br /> auger has ceased to rotate <br /> 8 Unattended boreholes must be properly covered, or otherwise <br /> protected <br /> ' A- 6 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.