Laserfiche WebLink
Safety Practices for Excavation Operation <br /> 1 Before commencement of excavation in the vicinity of overhead <br /> electrical lines operator shall walk around equipment and <br /> ' verify a minimum of 20 feet clearance be maintained Any <br /> questions regarding appropriateness of excavation location <br /> should be brought to the attention of the On-site Safety <br /> Coordinator <br /> 2 Safety check of equipment will be performed by the delegated <br /> On-site Safety Coordinator <br /> 1 <br /> ' A- 7 <br />