Laserfiche WebLink
� i • <br /> 1 � <br /> 4.3 Budget and Cost Controls <br /> Budget and cost control information has been maintained internally by WO&S for possible <br /> eventual submittal for reimbursement All cost information is considered confidential <br /> 1 <br /> 4.4 Remediation Goals <br /> ' Sod and groundwater remediation goals will be identified following determination of <br /> affected water bodies' beneficial uses and impact that may be expected with various <br /> remediation and/or acceptance options <br /> 4.5 Additional Permits <br /> San Joaquin Valley APCD emission standards will not be violated during the testing or <br /> remediation process A well drilling permit from San Joaquin County PHS/EHD will be <br /> required for each parcel bored, signed by the drilling contractor <br /> ' 46 Final Report <br /> The Final Report will be prepared under the guidance of a licensed Civil Engineer to <br /> support a request for final closure consistent with Tri-Regional Guidelines The report will <br /> include <br /> 1 (1) analytical results from sod and water samples during the Phase 11 characterization <br /> stage <br /> (2) figures delineating the actual lateral and vertical extent of impacted soil <br /> ' (3) a discussion of risk based remediation factors <br /> (4) chain-of-custody records for certified analytical analysis <br /> 1 (5) evaluation of the analytical results and a discussion of the <br /> findings of exploratory and possible remediation phases <br /> ' (6) recommendations incorporating findings leading to the site's closure <br /> 1 Two copies will be forwarded to the overseeing agency or as requested with additional <br /> copies to support a UST Fund Claim <br /> 1 <br /> 1 <br /> i 4-Z <br /> 1 <br /> 1 <br />