My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005474
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
19256
>
2900 - Site Mitigation Program
>
PR0540323
>
ARCHIVED REPORTS_XR0005474
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:50:28 PM
Creation date
4/8/2020 3:37:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005474
RECORD_ID
PR0540323
PE
2950
FACILITY_ID
FA0023049
FACILITY_NAME
TELFER HIGHWAY TECHNOLOGIES
STREET_NUMBER
19256
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
CURRENT_STATUS
01
SITE_LOCATION
19256 N HWY 99
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> r <br /> • <br /> r 3 SCOPE OF WORK <br /> 1 <br /> i <br /> ' Western Oil & Spreading proposes the following tasks for the Acampo Plant site to <br /> support the objectives outlined in the plan, namely <br /> ' 1 Completion of sod remediation at the site <br /> 2 Characterize the shallow groundwater <br /> 3 Achieve closure of the site <br /> 31 Excavate and Stockpile Impacted Soil <br /> 31.1 The contamination zone has been partially defined by soil borings and will be <br /> further defined by visual and soil gas measurements during excavation Final definition <br /> rwill be established upon excavation <br /> r3 1 2 Excavation of contaminated soil can be accomplished by a variety of equipment <br /> Excavation will follow clearance by a utility locator service Initial soil removal to a depth <br /> rof as much as 15 FT bgs will utilize dozer and scraper style equipment leaving an open <br /> trench as much as 40 FT wide at the top if contamination is apparent at this stage an <br /> ' excavator such as a CAT 235 or equivalent reaching backhoe will be used Excavation <br /> ' will proceed from 5 FT step out from the concrete bock wall outwards until suitable sod <br /> quality is found A side slope sufficient to support the walls but no less than 1 1 will be <br /> ' continued downward Bottom width of the open trench will at a minimum, the depth bgs <br /> r 3-1 <br /> r <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.