My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
4444
>
2900 - Site Mitigation Program
>
PR0540885
>
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2020 9:16:19 AM
Creation date
4/10/2020 9:06:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0540885
PE
2960
FACILITY_ID
FA0023381
FACILITY_NAME
FORMER EXXON SERVICE STATION NO 73942
STREET_NUMBER
4444
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11022017
CURRENT_STATUS
01
SITE_LOCATION
4444 N PERSHING AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.. <br /> Former Exxon Service Station No. 73942 Page 2 of 3 <br /> 4444 North Pershing Avenue April 3, 2015 <br /> Stockton, California 95207 <br /> • Analyzing selected soil samples from B2 (aka B15) for total petroleum hydrocarbons <br /> (TPH) as gasoline (TPHg), TPH as diesel (TPHd), and the Environmental Protection <br /> Agency Method 8260 suite of compounds that include: benzene, toluene, ethylbenzene <br /> and total xylenes (BTEX); methyl tertiary-butyl ether (MTBE), ethyl tertiary-butyl ether <br /> (ETBE), di-isopropyl ether (DIPE), tertiary-amyl methyl ether (TAME), and tertiary butyl <br /> alcohol (TBA); <br /> • Installing one off-site monitoring well, MW15, using hollow-stem-auger drill technology, <br /> to approximately forty feet bsg, on the north side of Rosemarie Lane at the location <br /> illustrated on Plate 2 of the Addendum after obtaining an access agreement from the <br /> property owner; <br /> • Collecting soil samples at five-foot intervals to depths of approximately twenty-five feet <br /> bsg, then collecting continuous soil samples "across the anticipated screened interval" <br /> from approximately twenty-five to forty feet bsg for lithologic evaluation; <br /> • Shortening the proposed well screen-interval length if "multiple, distinct course-grained <br /> layers are encountered"; <br /> • Based on field criteria listed in bullet three above, submitting a minimum of four soil <br /> samples from the well borehole for chemical analyses listed in bullet four above; and <br /> • Submitting a report of findings following the field work that includes the advancement of <br /> two soil borings and one monitoring well. <br /> The following are EHD's responses to the Addendum: <br /> • The EHD is concerned that the proposed depth of sixty feet bsg for B2 (aka B15) may <br /> not satisfy the objective of defining the vertical extent of petroleum hydrocarbon <br /> contamination. This is based on historical soil analytical data indicating significant <br /> concentrations of contaminants of concern at approximately forty feet bsg in boreholes <br /> IP3 and V1, approximately ten feet northeast and southwest, respectively, of proposed <br /> boring B2 (aka B15), and detection of contaminants of concern in soil samples collected <br /> at approximately ninety-nine feet bsg in down-gradient well MW14. The EHD approves <br /> the advancement of B2 (aka B15) with the condition that field criteria listed in bullet three <br /> be employed to identify petroleum hydrocarbon contamination and determine the total <br /> depth of the borehole. <br /> • The EHD suggests that, going forth, 61 (aka B14) and B2 (aka B15) be renamed SB14 <br /> and S1315, respectively. This proposed nomenclature conforms to the historical naming <br /> of boreholes at this site and will assist in identifying the sequential order of these borings <br /> for future reference. <br /> • Although Cardno proposes to install off-site well MW15, the Addendum lacks specifics <br /> concerning the construction of the well. The EHD approves the installation of MW15 <br /> with the conditions that eight-inch augers are used for advancing the borehole; two-inch- <br /> diameter Schedule 40 casing is employed, No. 3 sand is used for the filter pack for <br /> 0.020-inch casing slots or No. 2/12 sand is used for the filter pack for 0.010-inch casing <br /> slots; the filter pack extends from total depth of the borehole to at least two feet above <br /> the screened interval; a three-foot bentonite seal is placed above the filter pack using <br />
The URL can be used to link to this page
Your browser does not support the video tag.