Laserfiche WebLink
• SOIL SAMPLING <br /> Soil samples are collected using a 2-inch-diameter by 18- or 24-inch-long modified California <br /> split-spoon sampler containing three or four 6-inch-long brass or stainless steel liners The sampler <br /> and liners are scrubbed in potable water and Alconox or equivalent detergent and rinsed with potable <br /> water after use at each sampling interval <br /> At each sample depth, the sampler is dnven 18 or 24 inches ahead of the augers into undisturbed <br /> soil When the sampler is retrieved, either the lowermost or the middle sample liner is removed and <br /> the ends of the tube are covered with Teflon tape and sealed with plastic caps The soil-filled liner is <br /> labeled with the borehole number, sample depth, site location, date, and time The samples are <br /> placed in zip-lock bags and stored in a cooler containing ice <br /> Soil from one of the liners is removed and placed in a sealed plastic bag The soil is scanned with an <br /> OVA equipped with a flame ionization detector (FID) or photoionization detector (PID), and the <br /> readings are noted on the soil boring logs The soil from the remaining liner(s) is examined and <br /> classified according to the Unified Soil Classification System <br /> Soil samples are delivered, under chain of custody, to a laboratory certified by the California <br /> Department of Health Services (DHS) for analyses <br /> lie INJECTION POINT WELL INSTALLATION <br /> The boreholes completed as injection point wells are typically constructed by installing two nested <br /> stainless steel injection points(one point for ozone and one point for hydrogen peroxide)through the <br /> inner opening of the auger The ozone injection well point is completed with a 1-to 3-foot length of <br /> 3/4-inch-diameter well screen/diffuser at the end of the stainless steel casing The hydrogen peroxide <br /> injection well point is completed with a 1-foot section of%-inch-diameter stainless steel well screen <br /> The top of the ozone diffuser is 5 feet below the base of the hydrogen peroxide screen The ozone <br /> diffuser is installed at the bottom of the nested injection well boring <br /> A filter pack of clean sand of appropriate size is placed in the annular space from 1 foot below to 2 <br /> feet above the ozone diffuser The sand is placed through the inner opening of the augers as they are <br /> slowly lifted A bentonite seal (approximately 2 feet of bentonite pellets hydrated with water) is <br /> placed above the sand pack surrounding the ozone diffuser to prevent short-circuiting Again a filter <br />' pack of clean sand of appropriate size is placed from 1 foot below the hydrogen peroxide well screen <br /> and to a depth of 2 feet above the top of the screen A transitional seal is completed above the sand <br /> pack by adding 2 feet of bentonite pellets and hydrating them with water A surface seal is then <br /> created by placing neat cement grout containing less than 5 percent bentonite from the top of the <br /> bentonite seal to just below the ground surface <br /> The injection point well is finished at the surface with a slightly raised,traffic-rated,watertight steel <br /> . traffic box set in concrete The traffic box is secured with bolts and the casing is further secured <br /> with a locking well cap <br /> 1 <br />' G1Prolccts1739421PUBLIC\IPR12041Protocols Injection PomtWell installation doc 2 <br />