Laserfiche WebLink
INJECTION POINT DEVELOPMENT <br /> The injection points are developed no less than 72 hours after completion Development consists of <br /> purging the well with a peristaltic pump or bailer until the water is free of silt and apparent turbidity <br /> When appropriate, air is gently introduced to the screened interval to further develop the well <br /> re f the purging methods and volumes of water urged is maintained All purge water is <br /> A cordo p gig p <br /> contained on the site in properly labeled 55-gallon drums Purge water is transported to an <br />' appropriate treatment facility <br /> 1 <br /> lie <br /> f <br /> 1 <br /> • <br />' G\Projects%734A2VU13UC\IPR72041Promcok ln)=,on PomtWell Installation doc 3 <br />