Laserfiche WebLink
�.i9 ? 7 �� <br /> FROh9 Ground Z_ro An3.l�isi-= PHONE HO. �C_ � 5� rJ'�c Nov. 02 2996 03:57PM F3 <br /> ATTACHMENT A <br /> COST ESTIMATE FOR SOIL SAMPLING <br /> (SECON'9D REVISION) <br /> ,Roy's Towing <br /> 3570 East Miner Avenue, Stockton <br /> Lab® <br /> Registered Geologist 4 hrs $ 95/hr $ 380 <br /> Staff Geologist 8 hrs 65/hr 520 <br /> Technician 16 hrs 45/hr 720 <br /> SUBTOTAL: $ 1'620 <br /> b �4IX <br /> TRPH and total lead only 14 samples $ 121/sample 1,694 <br /> TPHg, TPHd, TRPH, BTEX <br /> EPA 8010 and total lead 11 samples 317/sample 3,487 <br /> STLC lead (potential) 4 samples 92/sample 368* <br /> StMTOtTAL: J5.349 <br /> EQWV ent_ <br /> Drilling contractor 1,187 <br /> Permit 102 <br /> Hand auger 1 day $ 50/day 50 <br /> Brass liners wnd caps 24 7.50 each 1$0 <br /> Surveying equipment 1 day 75/day 75 <br /> Photoionintion Detector 1 day 75/day 75 <br /> Drums and Visqueen (for cuttings) 100 <br /> SUBTOTAL; $ 1,769 <br /> SUBTOTAL: $ 2,00Q <br /> TOTAL COST ESTIMATE: <br />