Laserfiche WebLink
ATTACHMENT A <br /> COST ESTIMATE FOR SOIL SAMPLING <br /> (THIRD REVISION) <br /> Roy's Towing <br /> 3570 East Miner Avenue, Stockton <br /> Labor <br /> Registered Geologist 4 hrs $ 95/hr $ 380 <br /> Staff Geologist 8 hrs 65/hr 520 <br /> Technician 16 hrs 45/hr 720 <br /> SUBTOTAL: $ 1,620 <br /> Laboratory <br /> TRPH and total lead only 14 samples $ 121/sample 1,694 <br /> TPHg, TPHd, TRPH, <br /> EPA 8240 and total lead 11 samples 432/sample 4,752 <br /> STLC lead (potential) 4 samples 92/sample 368 <br /> SUBTOTAL: $ 6,814 <br /> F=Quipment <br /> Drilling contractor 1,187 <br /> Permit 102 <br /> Hand auger 1 day $ 50/day 50 <br /> Brass liners and caps 24 7.50 each 180 <br /> Surveying equipment 1 day 75/day 75 <br /> Photoionization Detector 1 day 75/day 75 <br /> Drums and Visqueen (for cuttings) 100 <br /> SUBTOTAL: $ 1,769 <br /> Report <br /> SUBTOTAL: $ 2.000 <br /> TOTAL COST ESTIMATE: JIZ,203 <br /> groundze\roy'stow\costest <br />