Laserfiche WebLink
ROY' S TOWING Page 2 <br /> Hrs/Rate Amount <br /> 3/13/97 G.S. LABOR: 0.30 28.50 <br /> REPORT AND QC LAB RESULTS. 95.00/hr <br /> 3/14/97 G.S. LABOR: 0.80 76.00 <br /> REPORT AND QC LAB RESULTS. 95.00/hr <br /> J.B. LABOR: 1.50 97.50 <br /> DISCUSS WITH GS; DISCUSS LEAD RESULTS 65.00/hr <br /> WITH ARGON; REPORT PREPARATION. <br /> 3/17/97 J.B. LABOR: 0.20 13.00 <br /> DISCUSS LEAD RESULTS WITH GS AND LAB. 65.00/hr <br /> 3/19/97 G.S. LABOR: 0.50 47.50 <br /> REPORT PREPARATION 95.00/hr <br /> 3/20/97 G.S. LABOR: 2.30 218.50 <br /> REPORT PREPARATION 95.00/hr <br /> 3/21/97 G.S. LABOR: 1.50 142.50 <br /> REPORT PREPARATION 95.00/hr <br /> G.S. LABOR: 0.30 28.50 <br /> DISCUSSION WITH DOUG WILSON. 95.00/hr <br /> G.S. LABOR: 0.50 47.50 <br /> RESEARCH LANDBAN ON LEAD. 95.00/hr <br /> G.S. LABOR: 0.50 47.50 <br /> RESEARCH TREATMENT STDS. 95.00/hr <br /> 3/24/97 G.S. LABOR: 2.30 218.50 <br /> SOIL SAMPLING 95.00/hr <br /> A.S. LABOR: 1.00 45.00 <br /> PREP/UNLOAD 45.00/hr <br />