Laserfiche WebLink
ROY' S TOWING Page 3 <br /> Hrs/Rate Amount <br /> 3/24/97 A.S. TRAVEL 1.00 45.00 <br /> 45.00/hr <br /> A.S. LABOR: 2.00 90.00 <br /> SOIL SAMPLING 45.00/hr <br /> 3/25/97 G.S. LABOR: 0.50 47.50 <br /> SEPTIC ISSUE. 95.00/hr <br /> G.S. LABOR: 0.30 28.50 <br /> WORK REQUEST 95.00/hr <br /> J.B. LABOR: 0.60 39.00 <br /> CALLS REGARDING CONCRETE CUTTING; 65.00/hr <br /> CALL LAB TO CONFIRM SAMPLES. <br /> 3/26/97 G.S. LABOR: 2.30 218.50 <br /> PREPARE FOR SEPTIC SAMPLING. 95.00/hr <br /> G.S. LABOR: 0.50 47.50 <br /> CORRESPOND WITH COUNTY AND A.S. 95.00/hr <br /> J.B. LABOR: 0.30 19.50 <br /> CALLS REGARDING CONCRETE CUTTING; 65.00/hr <br /> CALL LAB TO CONFIRM SAMPLES. <br /> 3/27/97 A.S. LABOR: 1.00 45.00 <br /> PREP/UNLOAD 45.00/hr <br /> A.S. TRAVEL 1.00 45.00 <br /> 45.00/hr <br /> A.S. LABOR: 6.00 270.00 <br /> SEPTIC TANK SAMPLING. 45.00/hr <br /> 3/28/97 G.S. LABOR: 0.50 47.50 <br /> REVISE FIELD NOTES. 95.00/hr <br />